Lane County <br />Report ID. LBILL001 BILLABLE PROJECT COSTS <br />Page No 1 <br />Brancato 10/252010 <br />Run Tunc 13.58.41 <br />Billable Project Costs for Fiscal Period 2010-09 Period begins 09/01/2010 and ends including 09/302010 <br />Project: 36644179 P13M Fern Ridge Path (4641) Overhead Rates Applied far till, project: Federal (Where applicable) <br />Billed Bv: 3636213 Mate I~al Testing! Proc 36644179 <br />P4090.PCC quality control <br />TmnD.tc rraoID Resource Employed Qty Polunt Overhead Transaction Remark <br />J 09/01/2010 LABOR Engineering Assistant 05 a $736 5977 CLY BREAKS <br />1.4090 Totals $ 7.36S 9.77$ 17.13 <br />3636213 Materials'Eesting Total 17.1 <br />36 44179 Proiect Grand Total 17.13 <br />OCT 2 9 1010 <br />