Lane County <br />Report ID LBILLOnI BILLABLE PROJECT COSTS <br />Billable Proles Costs for Fncal Period 2010-09 Pend begins 09/012010 and ends including 09130/2010 <br />Project: 36644029 PBM W. 18th Ave (4584) Overhead Rates Applied forthis project' Federal (Where applicable) <br />Page No 3 <br />Run Date 10/252010 <br />Run Tour 13 55 36 <br />,f 09/17/2010 EQUIPMENT FORDRANGERPU 2WD I $194 t <br />09/1712010 LABOR Engineering Assistant I .J SI472 11955 SAMPLEPICI~UP <br />P4091 Totals 5 0 89.67 5 109,36 $ 199.03) <br />3636213 Materials Testinn Total 6953.11 <br />36644029 Project Grand Total $ 6953.11 <br />OCT 292010 <br />