11 <br />Lane County <br />Report ID 1.811.1.001 BILLABLE PROJECT COSTS Pagc No I <br />Run Data 10/252010 <br />Run Timc 14-0028 <br />Billable Project Costs for Fiscal Period 2010-09 Period begins 09/012010 and ends including 09/302010 <br />Project: 36644239 ARRA W. 11th (4664) Overhead Rates Applied for this project: Federal (Where applicable) <br />Billed BY 3636213 Materials Testing Prot 36644239 <br />114090-PCC quality control <br />'InnDate 7nnID Resource Employed <br />J 09/08/2010 LABOR Engineering Assistant <br />T9/09/2010 LABOR Engineering Assistant <br />P4090 Totals <br />Qty <br />A 711 Overhead <br />Tnnvamn Remark <br />05 <br />V $736 <br />5977 <br />CYLINDER BREAKS <br />05 <br />$736 <br />S977 <br />CYLINDER BREAKS <br />S 14.72 S <br />✓ 19.54 S 34.26 ✓ <br />3636213 Materials Testing Total R 34.26 <br />36644239 Proiect Grand Total 34.26 <br />OCT 292010 <br />