SEP -16 -2010 0951 <br />P. 02:02 <br />2G 541 /5 ' .i , l'N I A4 P F; Cu ? (! ?i,1iS <br />FAX 541/581-3915 r(:)h,l'6 ?A( ?uR;aJLi "'i <br />Cca N4tl,559 f�4ANAt�I',hrlErdl' <br />CONSTRUCTION <br />September 16, 2010 <br />Dave Ryan <br />City of Eugene <br />1820 Roosevelt Blvd. <br />Eugene, OR 87402 <br />Fax: 541-682-4882 <br />Re: Tandy Turn Park <br />BID PROPOSAL <br />1719 IRVING Rgnb <br />EUGENE. OR 97402 <br />P 8W 11735 <br />EUGENF, OR 97440 <br />20 Inc., dba 2G Construction proposes to f0mish all labor, material and equipment for the following <br />work: <br />Sidewalk replacement at Tandy Turn Park, per project description provided by Dave Ryan. <br />Total $7,110.00 <br />Submitted By, <br />�► - &CAJan& �S&rA <br />Duane Strickland " <br />Project Manager <br />✓\ <br />- �O� <br />TOTAL P.02 <br />