New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4613 Elm's Pmt#5 Final
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2011
>
GJN4613 Elm's Pmt#5 Final
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:24:14 PM
Creation date
11/8/2010 4:30:44 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004613
GL_Project_Number
995522
Identification_Number
2010100245
COE_Contract_Number
2010-00017
Retention_Destruction_Date
12/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Run Date: 11/04/2010 08:59:09 <br />Page 2 <br />City of Eugene <br />Contract <br />Preliminary Progress Payment <br />Payment No : 005 Final <br />Pay <br />Contractor: Elm's Landscape Services <br />Original Contract: <br />$152 <br />302.24 <br />Job 93-004613 <br />Current Amount: <br />, <br />$158,374.29 <br />Contract <br />No: 2010-00017 <br />Contract Award <br />Date: 03/29/2 <br />010 <br />PO 2010100245 <br />Completion <br />Date: 06/11/2 <br />010 <br />Assessable: No <br />Line <br />Description Last Chng Ord <br />Unit Price <br />Unit Measure <br />Current Contract <br />Quantit <br />A <br />Estimated Payment <br />Cumulative <br />Totals <br />Complete <br />y <br />mount <br />Quantity <br />Amount <br />Quantity <br />Amount <br />ALTON BAKER IRRIGATION <br />Base Bid <br />- Irrigation & Potable Water <br />0000 <br />LIQUIDATED DAMAGES <br />($400.00) <br />DAY <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0010 <br />MOBILIZATION <br />$12,870.00 <br />LUMPSUM <br />1.000 <br />$12,870.00 <br />0.000 <br />$0.00 <br />1.000 <br />$12,870.00 <br />100.00 <br />0020 <br />EROSION CONTROL <br />$600.00 <br />LUMPSUM <br />1.000 <br />$600.00 <br />0.000 <br />$0.00 <br />1.000 <br />$600.00 <br />100.00 <br />0030 <br />TEMP. PROTECTION AND DIRECTION <br />$620.00 <br />LUMPSUM <br />1.000 <br />$620.00 <br />0.000 <br />$0.00 <br />1.000 <br />$620.00 <br />100.00 <br />0040 <br />CONSULTING ARBORIST - ROOT ZON <br />$65.00 <br />HOUR <br />24.000 <br />$1,560.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0050 <br />POTABLE WATER POC & MODIFICATI <br />$1,226.50 <br />LUMPSUM <br />1.000 <br />$1,226.50 <br />0.000 <br />$0.00 <br />1.000 <br />$1,226.50 <br />100.00 <br />0060 <br />NEW POTABLE WATER LINE <br />$3.60 <br />FOOT <br />1,270.000 <br />$4,572.00 <br />0.000 <br />$0.00 <br />1,285.000 <br />$4,626.00 <br />101,00 <br />0070 <br />POTABLE WATER HOSE BIBB & ISO. <br />$1,364.00 <br />EACH <br />5.000 <br />$6,820.00 <br />0.000 <br />$0.00 <br />5.000 <br />$6,820.00 <br />100.00 <br />0080 <br />5.5" CONCRETE <br />$8.90 <br />SQFT <br />62.000 <br />$551.80 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0090 <br />IRRIGATION SYSTEM <br />$64,880.00 <br />LUMPSUM <br />1.000 <br />$64,880.00 <br />0.000 <br />$0.00 <br />1.000 <br />$64,880.00 <br />M 100.00 <br />0100 <br />BEDDING & PIPE ZONE MATERIAL <br />$11.60 <br />TON <br />75.000 <br />$870.00 <br />0.000 <br />$0.00 <br />258.930 <br />$3,003.59 <br />345.00 <br />0110 <br />IRRIGATION - SLEEVING - FUTURE <br />$25.00 <br />FOOT <br />12.000 <br />$300.00 <br />0.000 <br />$0.00 <br />12.000 <br />$300.00 <br />100.00 <br />0120 <br />IMPORTED CLASS A BACKFILL <br />$11.39 <br />TON <br />300.000 <br />$3,417.00 <br />0.000 <br />$0.00 <br />49.930 <br />$568.70 <br />17.00 <br />0130 <br />LAWN SEEDING & REPAIR <br />$92.77 <br />CUYD <br />77.000 <br />$7,143.29 <br />0.000 <br />$0.00 <br />113.000 <br />$10,483.01 <br />147.00 <br />Alternate <br />1 - Electrical Conduit <br />0140 <br />1.5 IN. ELECTRICAL CONDUIT <br />$3.97 <br />FOOT <br />580.000 <br />$2,302.60 <br />0.000 <br />$0.00 <br />575.000 <br />$2,282.75 <br />99.00 <br />0150 <br />2 IN. ELECTRICAL CONDUIT <br />$4.50 <br />FOOT <br />700.000 <br />$3,150.00 <br />0.000 <br />$0.00 <br />754.000 <br />$3,393.00 <br />108.00 <br />0160 <br />2.5 IN. ELECTRICAL CONDUIT <br />$25.78 <br />FOOT <br />20.000 <br />$515.60 <br />0.000 <br />$0.00 <br />10.000 <br />$257.80 <br />50.00 <br />0170 <br />JUNCTION BOX <br />8178.00 <br />EACH <br />8.000 <br />$1,424.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0180 <br />IMPORTED CLASS A BACKFILL <br />$11.39 <br />TON <br />90.000 <br />$1,025.10 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />Alternate <br />2 - Electrical Supply System <br />0190 <br />EWEB TRANSFORMER VAULT & CONDU <br />$7,655.75 <br />LUMPSUM <br />1.000 <br />$7,655.75 <br />0.000 <br />$0.00 <br />1.000 <br />$7,655.75 <br />100.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.