N <br />Lane County <br />Report ID LBILLIXII BILLABLE PROJECT COSTS Page No I <br />Run Date 10/252010 <br />Run Time 14 06 51 <br />Billable Project Costs for Fiscal Period 2010-09 Period begins 09/01/2010 and ends including 09/30/2010 <br />Project: 36644319 Bond Lane Park 4601) Overhead Rates Applied for this project: Federal (Where applicable) <br />Billed By 3636213 Materials Testing Pror 36644319 <br />P4090-PCC quality control <br />TmnDatc <br />TrmID <br />08/3112010 <br />EQUIPMENT <br />08/31/2010 <br />LABOR <br />09/07/2010 <br />LABOR <br />Resource Employed <br />SUBUR 3/4T 4X4-Phoemx <br />Engineering Technician 2 <br />Engineering Assistant <br />P4090 Totals <br />Qty <br />Amount Overhead <br />Tnnsac0on Remade <br />2 <br />$3 68 <br />2 <br />54628 <br />56145 <br />CONCRETE TESTING <br />05 <br />$736 <br />$977 <br />CYLINDER BREAKS <br />5 5732S <br />71.22S 128.54 <br />3636213 Materials Testine Total 128.54 <br />36644319 Project Grand Total 5 128.54 <br />OCT 291010 <br />r <br />