Lane County <br />Rcpon to LBILL001 BILLABLE PROJECT COSTS Page No I <br />Run Date 1012512010 <br />Run Time 13 57 08 <br />Billable Pmlect Costs for Fiscal Pmod 2010-09 Period begin 09/01/2010 and ends including 09302010 <br />Project: 36644109 Delta Ponds Path (4378) Overhead Rate, Applied for this Project- Federal (Where applicable) <br />Billed By. 3636213 Materials Testina Pro" 36644109 <br />P4090-PCC quality control <br />TonDatc <br />TmnID <br />Resource Employed <br />Qty <br />Amount Overhead <br />Tmmacuan Remark <br />0910312010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4-Phoems <br />2 <br />$368 <br />09/032010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />54628 <br />$6145 <br />CONCRETE TESTING <br />09/10/2010 <br />LABOR <br />Engneering Aevvam <br />05 <br />5736 <br />$977 <br />CYLBREAKS <br />P4090 Totals <br />$ 57.32 $ <br />71.22S 12854 <br />P4091-Concr <br />ete sample pickup <br />TranDate <br />TMID <br />Resource Employed <br />Qty <br />Amount Overhead <br />Transaction Remark <br />09/07/2010 <br />LABOR <br />Engineering Assistant <br />1 <br />$1472 <br />51955 <br />SAMPLEPICKUP <br />P4091 Totals <br />S 14.72S <br />19.55S 34.27 <br />3636213 Materials Testine Total $ 162.81 <br />36644109 Project Grand Total $ 162.81 <br />OCT 292010 <br />