Lane County <br />Report ID: LBILL001 BILLABLE PROJECT COSTS <br />Billable Project Costs for Fiscal Period 2010-08 Period begins 08/01/2010 and ends including 08/31/2010 <br />Project: 36644239 ARRA W. 11th (4664) Overhead Rates Applied for this project: Federal (Where applicable) <br />Page No. 1 <br />Run Date 10/08/2010 <br />Run Time 16:49:17 <br />Billed BY: <br />3636213 <br />Materials Testine Proi <br />: 36644239 <br />P4085-Asphalt <br />concrete glty control <br />TranDate <br />J 08/02/2010 <br />TranID <br />EQUIPMENT <br />Resource Employed <br />I TON PASSENGER VAN <br />Qty <br />8 <br />tlmouni <br />,Y $14.72 <br />Overhead <br />Transaction Remark <br />08/0212010 <br />LABOR <br />Engineering Technician 3 <br />8 <br />4S315.00 <br />5418.26 <br />AC SAMPLING & TESTING <br />J 08/04/2010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4-Phoenix <br />6 <br />v $11.04 <br />08/0412010 <br />LABOR <br />Engineering Technician 2 <br />6 <br />`J 5138.84 <br />5184.35 <br />ASPHALTTESTING <br />08/0512010 <br />J <br />EQUIPMENT <br />SUBUR 3/4T 4X4-Phoenix <br />6 <br />J $11.04 <br />08/0512010 <br />LABOR <br />Engineering Technician 2 <br />6 <br />S138.84 <br />5184.35 <br />ASPHALT TESTING <br />08/06/2010 <br />EQUIPMENT <br />SUBUR 3AT 4X4-Phoenix <br />6 <br />J 511.04 <br />08/06/2010 <br />LABOR <br />Engineering Technician 2 <br />6 <br />45138.84 <br />S184.35 <br />ASPHALT TESTING <br />P4085 Totals <br />S 779.36 <br />S 971.31 <br />S 1750.67 <br />P4090-PCC quality control <br />TranDate <br />TraniD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />`f 08/1012010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4-Phoenix <br />2 <br />J $3.68 <br />08110/2010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />~i $69.42 <br />592.18 <br />CONCRETE TESTING <br />708/11/2010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4-Phoenix <br />2 <br />S3.68 <br />_98/11/2010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />( $69.42 <br />$92.18 <br />CONCRETE TESTING <br />J 08/12/2010 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />2.5 <br />J S4.60 <br />_08/12/2010 <br />LABOR <br />Engineering Technician 3 <br />2.5 <br />$98.44 <br />S130.71 <br />PCC M/H'S <br />08/19/2010 <br />LABOR <br />Engineering Assistant <br />0.5 <br />J S7.36 <br />$9.77 <br />CYL BREAKS <br />P4090 Totals <br />S 256.60 <br />S 314.84 <br />S 581.44 <br />P4091-Concrete sample pickup <br />TranDate <br />TranlD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />J 08113/2010 <br />EQUIPMENT <br />FORD RANGER PU <br />1 <br />/ $1.94 <br />08/1312010 <br />LABOR <br />Engineering Assistant <br />1 <br />J $14.72 <br />$19.55 <br />SAMPLE PICKUP <br />P4091 Totals <br />S 16.66 <br />S 19.55 <br />S 36.21 <br />3636213 Materials Testin Total 2368.32 <br />36644239 Project Grand Total $ 2368.32 <br />OCT 14 2010 <br />