Lane County <br />Report ID LBILL001 BILLABLE PROJECT COSTS <br />Billable Project Costs for Fiscal Period 2010-08 Period begins 09/01/2010 and ends Including 08/31/2010 <br />Project: 36644029 PBMW.18t11Ave(4584) Overhead Rates Applied for this project: Federal (Where applicable) <br />V//to/lulu <br />L ciUK <br />nnglneenng l eenn6lan t 1 <br />~A 123 JJ <br />07129/2010 <br />LABOR <br />Engineering Assistant 1 <br />~f S1472 <br />0810212010 <br />EQUIPMENT <br />FORD RANGER PU 1 <br />$194 <br />08/022010 <br />LABOR <br />Engineering Assistant I <br />J S14.72 <br />P4091 Totals <br />S 58.57 <br />P4135-Mix design <br />TranDate <br />TraniD <br />Resource Employed <br />Qty <br />mount <br />J 07/26/2010 <br />EQUIPMENT <br />2009 FORD ECONOLINE 12 Passeng <br />2 <br />$3 IS <br />_07/26/2010 <br />1 <br />LABOR <br />Sr Engineering Associate <br />2 <br />$6068 <br />'7 <br />08/02/2010 <br />LABOR <br />Sr Engineering Associate <br />2 <br />VS6068 <br />0810412010 <br />LABOR <br />Sr Engineering Associate <br />25 <br />✓ $75 85 <br />'J <br />iJ 08/052010 <br />LABOR <br />Sr Engineering Associate <br />25 <br />$7585 <br />P4135 Totals <br />$ 27624 <br />Page No 2 <br />Run Doe 10/1112010 <br />Run Timc 08 47 40 <br />333 be CYL PICK l1P <br />$1955 SAMPLE PICKUP <br />$1955 CYL PICK UP <br />S 72.76 5 131.33 <br />Overhead Transaction Remark <br />S8057 CTB TRIAL BATCH <br />58057 CT13 DESIGNS <br />S10071 CTB DESIGNS <br />S10071 CT13 DESIGNS <br />S 362.56 S 638.80 <br />3636213 Materials Testinn Total 1738.46 <br />36644029 Project Grand Total S 1738.46 <br />OCT 14 2010 <br />