jPage"[ of I <br />Plan Review For Amazon``Meadows Phase I <br />Option A <br />2/24/04 <br />Land Use Referral # <br />ST0129 <br />S Description <br />ucture <br />Adjusted <br />divided by <br />: <br />Type <br />JW Ftg # of DWd /ft Lin Ftg # of a Wd /ft Ftg # ofe Wd /ft in Ftg <br />Lin Ftg <br />30' <br />Cost <br />31 01 150 300 10 $3,000 <br />Livingston Avenue <br />Local 960 15 30 <br />450 4 <br />95 60 <br />Notes: 3 full street lights= 150' <br />2 01 100 340 11 $3,300 <br />MehrAvenue <br />Local 1 10101 171 301 <br />5101 41 <br />151 601 <br />Notes: 2 full street lights = 100 <br />51 01 1 22 $6,600 <br />I Murin Street <br />I Local 1 13401 81 301 <br />2401 121 <br />151 1801 <br />Notes: 5 full street lights = 250' <br />2 0 100 230 1 8 $2,400 <br />North Alley <br />Local 390 0 30 <br />0 4 <br />15 60 <br />Notes: 2 full street light = 100' <br />21 0 ­100 385 13 $3,900 <br />South Emerald Loop <br />I Local 1 8751 101 301 <br />3001 61 <br />151 901 <br />Notes: 2 full street lights = 100' <br />41 01 ' . 200 425 $4,200 <br />Wallace Avenue <br />I Local 1 11351 141 301 <br />4201 61 <br />151 901, <br />Notes: 4 full street lights = 200' <br />Total Calculated Cost: $23,400 <br />1.0 % Mortality Rate: $2,340 <br />TOTAL: $25,740 <br />jPage"[ of I <br />