Final Acceptance <br />Completion of Warranty Period <br />14,14- Fm%\ <br />UZ3 1W Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: Asphalt Maintenance Inc. <br />Project: 2008 Slurry Seals <br />Contract Number: 08-30 <br />Date: September 29, 2010 <br />From: The City of Eugene PW Engineering <br />Job Number: 4510 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer. <br />Address: <br />Owner. <br />Address: <br />CIYl7 wnuacror me tngineer owner surety PW Admin Construction Manager Revised 4/04 <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br />