SECTION 3: EVALUATION FORMS <br />3.A Left Turn Signals — ODOT Warrants for Phasing <br />3.B Multi -way Stop Sign Warrant <br />3.0 Stop Sign Warrant <br />3.1) Yield Sign Warrant <br />3.E Signal Warrant <br />SECTION4: AUTHORIZATIONS <br />4.A <br />2. PEPI <br />4.B <br />3. PPP <br />2.Y <br />Inspection of Projects <br />4.D <br />1, CIP <br />2. PEPI <br />3. PPP <br />4. ROW Issues <br />2.Z <br />Service Requests <br />2.AA <br />LTD Coordination <br />2.AB <br />Unwarranted Traffic Controls <br />SECTION 3: EVALUATION FORMS <br />3.A Left Turn Signals — ODOT Warrants for Phasing <br />3.B Multi -way Stop Sign Warrant <br />3.0 Stop Sign Warrant <br />3.1) Yield Sign Warrant <br />3.E Signal Warrant <br />SECTION4: AUTHORIZATIONS <br />4.A <br />Stop <br />4.B <br />Parking Removal <br />4.0 <br />Signal <br />4.D <br />Speed <br />SECTION 5: REFERENCES <br />5.A References — current editions: <br />1. Federal Highway Administration Highway Capacity Manual <br />2. Oregon Department of Transportation (ODOT) Speed Manual <br />3. Traffic Practices Handbook for Local Roads and Streets in Oregon (ODOT) <br />4. Trip Generation — Institute of Transportation Engineers (ITE) <br />5. Traffic Control Devices Handbook (ITE) <br />6. City of Eugene Arterial and Collector Street Plan <br />7. American Association of State Highway and Transportation Officials (AASTHO) <br />8. Institute of Transportation Engineers (ITE) <br />Traffic Operations Policy & Procedures Rev. 5/19/2008 <br />