2010 —Fall Bench Pads <br />Les Brock Construction <br />Scope of Work ® Exhibit C <br />Contractor to complete all utility locates, earth work, forming, pouring and finishing for the following 8 pad locations: <br />East Bank Path, near 570 Wimbeldon <br />Status: Site pending approval by homeowners association. Approved by City with reduced pad size <br />® 6' x 5 1/2' pad <br />® feathered back edge <br />o backfill around as needed <br />West Bank Path — Location #11 (see attached map) <br />Status: Site approved <br />o Pad - 10'x12' <br />West Bank Path — Location #12 (see attached map) <br />Status: Site approved <br />• Pad - 10'x12' <br />• Not adjacent to bike path, angle for SE view <br />West Bank Path, near Hillcrest NW side of access path on the corner Location #10 (see attached map) <br />Status: Site approved. <br />• Pad —10' x 12' — not rectangle, match to curve <br />• High priority <br />West Bank Path, near Hillcrest NE side of access path on the corner— Location #9 (see attached map) <br />Status: Site approved. <br />® match curve to other side <br />® Pad - 10'x12' <br />® Remove old post <br />Maury Jacobs Park (A) <br />Status: Site approved. Add to existing pad near playground. See pic <br />® Extend existing pad to bike path and angle at each side. <br />Amazon Park, rough mow area near dog park parking lot <br />(see attached map) <br />Status: Site approved through permit dept. <br />® 4 ft bench <br />® Pad - 8'x 10' <br />Laurel Hill Valley Park— upper pathway— (B) <br />Status: Site approved. See pic. <br />m Pad — 10'x12' <br />® Priority <br />i <br />