Repon ID LBILL001 <br />Lane County <br />BILLABLE PROJECT COSTS <br />Page No 2 <br />Run Date 09/072010 <br />Run Ttme 14 52 06 <br />Billable Project Costs for Fiscal Period 2010 -07 Period begins 07/012010 and ends including 071312010 <br />Project: 36644369 Crest/Story Phase 2 (4546) <br />Overhead Rates Applied for this project: Operations] (Where applicable) <br />P4090 Totals <br />S 86.18 <br />S 131.73 <br />S 217.91 <br />P4091- Concrete sample pickup <br />\ <br />TrmData TmnJD Resource Employed <br />Qry Amount <br />Overhead <br />Transaction Remark <br />7 07/02/2010 EQUIPMENT FORDRANGERPU <br />1 $194 <br />07102/2010 LABOR Engineentig Assistant <br />1 $1436 <br />$2345 <br />CONCRETE PICKUP <br />P4091 Totals <br />S 1630 <br />S 23.45 <br />S 39.75 <br />3636213 Materials Testine Total S 184015 <br />36644369 Project Grand Total $ 184015 <br />yip <br />6 <br />4� <br />sEP 0 92010 <br />