421 <br />Lane County <br />Report H) LBILL001 BILLABLE PROJECT COSTS <br />Billable Project Costs for Fisml Period 2010-07 Period begins 07/01/2010 and ends including 07/31/2010 <br />Project: 36644199 Willamette St. PBM (4582) Overhead Rates Applied for this project: Operational (Where applicable) <br />Page No 1 <br />Run Date 09/07/2010 <br />Run Time 14 50 03 <br />Billed By- <br />3636213 Materials Testing Proi <br />. 36644199 <br />P4080-Base aggregates glty control <br />TmnDate <br />TraND <br />Resource Employed <br />Qty <br />Amount <br />Ovethead <br />Transaction Remark <br />07/21/2010 <br />EQUIPMENT <br />SUBUR3/4T4X4-Phoenx <br />1 <br />$184 <br />07/21/2010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />52314 <br />$3779 <br />AGO TESTING <br />P4080 Totals <br />5 24.98 <br />5 37.79 <br />S 62.77 <br />P4085-Asphalt <br />concrete gity, control <br />TmnDate <br />T.nlD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />07/192010 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />I <br />$1 84 <br />07/19/2010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />$25 35 <br />S4140 <br />AC DFS, CHANGE TO S WILLAMETTE WHEN NEW P # IS ASSIGNED <br />07/20/2010 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />1 <br />$184 <br />07/20/2010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />S25 35 <br />S4140 <br />AC DFS, CHANGE TO S WILLAMETTE WHEN NEW P # IS ASSIGNED <br />07122/2010 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />25 <br />S460 <br />07/22/2010 <br />LABOR <br />Engineering Assistant <br />3 <br />544.16 <br />57212 <br />ASPHALT TESTING <br />0722/2010 <br />LABOR <br />Engineering Technician 2 <br />25 <br />$6338 <br />$10351 <br />AC DFS, CHANGE TO S WILLAMETTE WHEN NEW P#IS ASSIGNED <br />07/23/2010 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />2 <br />$368 <br />07/23/2010 <br />LABOR <br />Engmeering Techmnan 2 <br />2 <br />$5070 <br />$8280 <br />AC DFS, CHANGE TO S WILLAMETTE WHEN NEW P # IS ASSIGNED <br />P4085 Totals <br />$ 220.90 <br />S 341.23 <br />S 562.13 <br />P4086-Asphalt <br />sample pickup <br />TmnDate <br />TranID <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />07222010 <br />EQUIPMENT <br />SUBUR3/4T 4X4-Phoenix <br />1 <br />$184 <br />07/222010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />52314 <br />$3779 <br />ASPHALT SAMPLE PICKUP <br />P4086 Totals <br />$ 24.98 <br />$ 37.79 <br />S 62.77 <br />3636213 Materials Testing Total 687.67 <br />36644199 Project Grand Total 687.67 <br />V <br />SEP 0 92010 <br />