Lane County <br />Report ID LBILL001 BILLABLE PROJECT COSTS <br />Billable Pro ect Costs for Fiscal Period 2010-07 Period hegms 07/01/2010 and ends including 07/31/2010 <br />Project: 36644209 Valley River Dr PPP (4637) Overhead Rates Applied for this project: Operational (Where applicable) <br />aft <br />Page No I <br />Run Date 09/072010 <br />Run Time 14 51 05 <br />Billed Bv: <br />3636213 Materials Testing Prot <br />: 36644209 <br />P4085-Asphalt concrete gity control <br />TtanDste <br />TranlD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />07/19/2010 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />I <br />$194 <br />07/192010 <br />LABOR <br />Enginemng Technician 3 <br />4 <br />$15751 <br />525725 <br />CONTRACTOR CHANGE SCHEDULE WITHOUT NOTIFICATION <br />07/202010 <br />LABOR <br />Engineering Technician 3 <br />1 <br />$3938 <br />$6432 <br />CONTRACTOR CHANGE SCHEDULE WITHOUT NOTIFICATION <br />07212010 <br />LABOR <br />Engineering Technician 3 <br />1 <br />$3938 <br />S6432 <br />CONTRACTOR CHANGE SCHEDULE WITHOUT NOTIFICATION <br />07222010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4-Phocmx <br />9 <br />$1656 <br />072212010 <br />LABOR <br />Engineering Assistant <br />65 <br />511408 <br />518632 <br />ASPHALT TESTING <br />07/2212010 <br />LABOR <br />Engineering Technician 2 <br />9 <br />$26611 <br />S4346I <br />ASPHALTTESTING <br />07/232010 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />6 <br />$1104 <br />07232010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4-Phcemx <br />I <br />SI 84 <br />07/232010 <br />LABOR <br />Engineering Assistant <br />9 <br />$14720 <br />524041 <br />ASPHALTTESTING <br />07232010 <br />LABOR <br />Engineering Technician 2 <br />I <br />$23 14 <br />$3779 <br />ASPHALT TESTING <br />07/232010 <br />LABOR <br />Engmmnng Technician 3 <br />6 <br />$23625 <br />$38584 <br />AC DFS <br />P4085 Total. <br />S 105433 <br />S 1670.86 <br />S 2725-19 <br />P4086-Asphalt <br />sample pickup <br />TranDate <br />Tmn1D <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />07/22/2010 <br />EQUIPMENT <br />2009 FORD ECONOLME 12 Passeng <br />I <br />SI 59 <br />07/22/2010 <br />LABOR <br />Sr Engineering Associate <br />1 <br />$3034 <br />$4955 <br />AC SAMPLE PU <br />07/232010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4-Phoemx <br />I <br />SI 84 <br />07/23/2010 <br />LABOR <br />Engineering Technmtan2 <br />I <br />$2314 <br />53779 <br />ASPHALT SAMPLE PICKUP <br />P4086 Tunisia <br />S 56.91 <br />S 87.34 <br />S 144 25 <br />3636213 Materials Testin Total 2869.44 <br />36644209 Project Grand Total 2869.44 <br />SEP 0 9 2010 <br />