New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN004657 Inv. 3182 LCPW
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2011
>
GJN004657 Inv. 3182 LCPW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:41:58 PM
Creation date
10/11/2010 4:04:45 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004657
GL_Project_Number
905074
Identification_Number
2011005269
COE_Contract_Number
2010-00202
Retention_Destruction_Date
8/3/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lane County <br />Report ID LBILL001 BILLABLE PROJECT COSTS <br />Billable Project Costs for Fiscal Period 2010-07 Period begins 07/012010 and ends including 07/31/2010 <br />Project: 36644189 13th Ave PPP (4657) Overhead Rates Applied for this project- Operational (Where applicable) <br />Page No 1 <br />Run Date 09/07/2010 <br />Run Time 14 49 02 <br />Billed By <br />3636213 Materials Testing Pror <br />36644189 <br />P4080-Base aggregates glty control <br />renDate <br />~ <br />TtanlD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />7/152010 <br />1 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />15 <br />$276 <br />~~lxl3 <br />\07/152010 <br />LABOR <br />Engineering Technician 2 <br />15 <br />VS3803 <br />$6211 <br />BASE AGO DFS <br />X07/162010 <br />LABOR <br />Engineering Assistant <br />1 <br />$1472 <br />52404 <br />DENSITY TESTING <br />071162010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />/$5070 <br />$8280 <br />BASE AGO DFS <br />\ <br />X07/192010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4.Phoenix <br />1 <br />$194 <br />07119/2010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />31 $2314 <br />$3779 <br />AGO TESTING - <br />\07/20/2010 <br />EQUIPMENT <br />SUBUR 314T 4X4-Phmix <br />1 <br />$184 <br />\ <br />`07202010 <br />LABOR <br />Engineering Assistant <br />I <br />x/$1472 <br />$2404 <br />AGO DENSITY <br />07/202010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />x/$2314 <br />$3779 <br />AGO TESTING <br />\ <br />07/212010 <br />EQUIPMENT <br />SUBUR 314T 4X4-Phocmx <br />1 <br />Si 84 <br />07/212010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />%/$23 14 <br />$3779 <br />AGO TESTING <br />P4080 Totals <br />S 195 87 <br />S 306.36 <br />S 50213 <br />P4085-Asphalt <br />concrete glty control <br />TranDate <br />\ <br />Trao1D <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />07/I52010 <br />EQUIPMENT <br />1 TON PASSENGER VAN <br />I <br />St 84 <br />07/15/2010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />is t$38 03 <br />$62 11 <br />AC DFS <br />X07/162010 <br />EQUIPMENT <br />I TON PASSENGER VAN <br />2 <br />$368 <br />07/16/2010 <br />LABOR <br />Engiueermg Technician 2 <br />2 <br />$5070 <br />$8280 <br />ACDFS <br />\07/192010 <br />EQUIPMENT <br />SUBUR 3/474X4Phoemx <br />2 <br />$368 <br />07/19/2010 <br />LABOR <br />Engmacrug Technician 2 <br />2 <br />%L,4628 <br />$7558 <br />ASPHALT TESTING' <br />07/20/2010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4-Phoenix <br />2 <br />$368 <br />07/202010 <br />LABOR <br />Engineering Techmuan 2 <br />2 <br />Nf $46 28 <br />$7558 <br />ASPHALT TESTING <br />07121/2010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4-Phoenix <br />2 <br />$368 <br />07/21/2010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />%/S4628 <br />$7558 <br />ASPHALT TESTING ' <br />P4085 Totals <br />S 244.13 <br />S 371.65 <br />5 615.78 <br />P4090-PCC qu <br />ality control <br />TmnDate <br />Tmn1D <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />07/16/2010 <br />LABOR <br />Engineering Assistant <br />I <br />4IS1472 <br />52404 <br />CONCRETE TESTING <br />07/232010 <br />EQUIPMENT <br />SUBUR 3/4T 4X4-Phoenix <br />2 <br />$3 fib <br />07123/2010 <br />LABOR <br />Engineering Technician 2 <br />2 <br />V S46 28 <br />$75 58 <br />CONCRETE TESTING <br />P4090 Total, <br />S 64.68 <br />S 99.62 <br />S 164.30 <br />P4091-Concret <br />e sample pickup <br />TmnDate <br />TranlD <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />07/19/2010 <br />EQUIPMENT <br />SUBUR3/4T4X4-Phoenix <br />1 <br />$184 <br />-i' <br />n <br />07/19/2010 <br />LABOR <br />Engineering Technician 2 <br />1 <br />%/S2314 <br />$3779 <br />CONCRETE SAMPLE PICKUP ~ <br />P4091 Totals <br />S 24.98 <br />S 37.79 <br />S 62.77 <br />r, <br />SEP 0 9 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.