<br />Lane County <br />Report ID LBILL001 BILLABLE PROJECT COSTS Page No 2 <br />Run Date 09/072010 <br />Run Time 14 47 15 <br />Billable Project Costs for Final Period 2010-07 Period begins 07/01/2010 and ends including 07/31/2010 <br />Project: 36644149 33rd AvePPP(4617) Overhead Rates Applied for this project: Operational (Where applicable) <br />07/232010 LABOR Engineering Annitum 05 $736 $1202 CONCRETE TESTING > r,~l <br />07/23/2010 LABOR Engineering Assistant 05 $7 36 $1202 PCC BREAKS - <br />P4090 Totals 3 104.27 $ 158.27 S 26254 <br />P4091Concrefe sample pickup <br />Tr mDate <br />TMID <br />Resource Employed <br />Qty <br />Amount <br />Overhead <br />Transaction Remark <br />\107aMO10 <br />EQUIPMENT <br />FORDRANGERPU <br />1 <br />$194 <br />,07/22/2010 <br />LABOR <br />Engineering Assistant <br />1 <br />S14 72 <br />$2404 <br />PCC PICK UP <br />07/232010 <br />EQUIPMENT <br />FORD RANGER PU <br />1 <br />$194 <br />07/2312010 <br />LABOR <br />Engineering Assistant <br />1 <br />q 514 72 <br />$2404 <br />PCC PICKUP J <br />P4091 Totals <br />S 33.32 <br />$ 48.08 <br />S 81.40 <br />3636213 Materials Testing Total 2331.32 <br />36644149 Proiect Grand Total 2331.32 <br />SEP 0 92010 <br />