Run Date: 10/04/2010 10:11:11 <br />Contractor: EUGENE SAND CONST. <br />Job 93-004655 <br />Contract No: 2010-00020 <br />PO 2010100296 <br />Assessable: No <br />Line Description Last Chng Ord <br />Estimated Payment Cumulative Totals <br />Amount Quantity Amount Quantity Amount <br />Page 5 <br />% Complete <br />0570 <br />CITY PROVIDED SPEC INFO SIGNS <br />$200.00 <br />EACH <br />4.000 <br />$800.00 <br />0.000 <br />$0.00 <br />4.000 <br />$800.00 <br />100.00 <br />0580 <br />EROSION CONTROL <br />$1,000.00 <br />LUMPSUM <br />1.000 <br />$1,000.00 <br />0.000 <br />$0.00 <br />1.000 <br />$1,000.00 <br />100.00 <br />0590 <br />CWM PLAN/SUMMARY <br />$100.00 <br />EACH <br />2.000 <br />$200.00 <br />1.000 <br />$100.00 <br />2.000 <br />$200.00 <br />100.00 <br />0600 <br />REMOVE PIPE <br />$5.00 <br />FOOT <br />103.000 <br />$515.00 <br />0.000 <br />$0.00 <br />93.000 <br />$465.00 <br />90.00 <br />0610 <br />10" INCH C900 PIPE <br />$110.00 <br />FOOT <br />103.000 <br />$11,330.00 <br />0.000 <br />$0.00 <br />93.000 <br />$10,230.00 <br />90.00 <br />0620 <br />ADJUSTING BOXES <br />$250.00 <br />EACH <br />24.000 <br />$6,000.00 <br />0.000 <br />$0.00 <br />12.000 <br />$3,000.00 <br />50.00 <br />0630 <br />MINOR ADJUSTMENT OF MANHOLES <br />$1,200.00 <br />EACH <br />15.000 <br />$18,000.00 <br />0.000 <br />$0.00 <br />16.000 <br />$19,200.00 <br />107.00 <br />0640 <br />MH FRAME/COVER-ST <br />$270.00 <br />EACH <br />12.000 <br />$3,240.00 <br />0.000 <br />$0.00 <br />10.000 <br />$2,700.00 <br />83.00 <br />0650 <br />MH FRAME/COVER-WW <br />$270.00 <br />EACH <br />2.000 <br />$540.00 <br />0.000 <br />$0.00 <br />2.000 <br />$540.00 <br />100.00 <br />0660 <br />COLD PLANE PVMT REMOVAL, 3" DE <br />$0.17 <br />SQFT <br />98,700.000 <br />$16,779.00 <br />0.000 <br />$0.00 <br />99,674.700 <br />$16,944.70 <br />101.00 <br />0670 <br />SEAL COAT <br />$1.35 <br />SQYD <br />9,620.000 <br />$12,987.00 <br />0.000 <br />$0.00 <br />8,004.300 <br />$10,805.81 <br />83.00 <br />0671 <br />UPGRADED SEAL COAT(OAKWAY)(JOB 001 <br />$0.31 <br />SQYD <br />8,004.300 <br />$2,481.33 <br />0.000 <br />$0.00 <br />8,004.300 <br />$2,481.33 <br />100.00 <br />0680 <br />LEVEL 3, 1/2" DENSE WMAC <br />$55.00 <br />TON <br />1,840.000 <br />$101,200.00 <br />0.000 <br />$0.00 <br />1,982.300 <br />$109,026.50 M <br />108.00 <br />0690 <br />PAVEMENT REMOVAL <br />$3.00 <br />SQFT <br />105.000 <br />$315.00 <br />0.000 <br />$0.00 <br />105.000 <br />$315.00 <br />100.00 <br />0700 <br />ASPHALT CONCRETE PAVEMENT REPA <br />$125.00 <br />CUYD <br />40.000 <br />$5,000.00 <br />0.000 <br />$0.00 <br />15.080 <br />$1,885.00 <br />38.00 <br />0710 <br />CONCRETE CURB <br />$13.00 <br />FOOT <br />16.000 <br />$208.00 <br />0.000 <br />$0.00 <br />16.000 <br />$208.00 <br />100.00 <br />0720 <br />CONCRETE CURB AND GUTTER <br />$32.00 <br />FOOT <br />40.000 <br />$1,280.00 <br />0.000 <br />$0.00 <br />38.000 <br />$1,216.00 <br />95.00 <br />0730 <br />CONCRETE WIDE CURB AND GUTTER <br />$55.00 <br />FOOT <br />30.000 <br />$1,650.00 <br />0.000 <br />$0.00 <br />33.800 <br />$1,859.00 <br />113.00 <br />0740 <br />TRUNCATED DOME TEXTURING <br />$15.00 <br />SQFT <br />8.000 <br />$120.00 <br />0.000 <br />$0.00 <br />8.000 <br />$120.00 <br />100.00 <br />0750 <br />CONCRETE WALK, 4" THICK <br />$7.00 <br />SQFT <br />170.000 <br />$1,190.00 <br />0.000 <br />$0.00 <br />170.600 <br />$1,194.20 <br />100.00 <br />0760 <br />PVMT LEGEND, TYPE B: ARROWS <br />$275.00 <br />EACH <br />4.000 <br />$1,100.00 <br />0.000 <br />$0.00 <br />5.000 <br />$1,375.00 <br />125.00 <br />0770 <br />PVMT LEGEND, TYPE B: BICYCLE L <br />$250.00 <br />EACH <br />10.000 <br />$2,500.00 <br />0.000 <br />$0.00 <br />9.000 <br />$2,250.00 <br />90.00 <br />0780 <br />PVMT BAR, TYPE B <br />$8.00 <br />SQFT <br />114.000 <br />$912.00 <br />0.000 <br />$0.00 <br />108.000 <br />$864.00 <br />95.00 <br />0790 <br />MONO-DIRECTIONAL CRYSTAL TYPE <br />$5.00 <br />EACH <br />25.000 <br />$125.00 <br />0.000 <br />$0.00 <br />13.000 <br />$65.00 <br />52.00 <br />City of Eugene <br />Contract Preliminary Progress Payment <br />Payment No : 005 <br />Original Contract: $935,160.00 <br />Current Amount: $964,334.50 <br />Contract Award Date: 05/12/2010 <br />Completion Date: 08/13/2010 <br />Current Contract <br />Unit Price Unit Measure Quantity <br />