New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4591 ECA
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2011
>
GJN4591 ECA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 3:13:16 PM
Creation date
10/6/2010 4:24:37 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
GJN
004591
GL_Project_Number
374591
Retention_Destruction_Date
12/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Type of Improvement: V VVW -C3 <br />Jig Cy kD <br />occ( <br />(Paving, wastewater, stormwater, street lights) <br />Location: S ` J 6 <br />(Street or ease a t. If a subdivision, print subdivision name) <br />North or east limit: South or west limit: <br />(Except for subdivisions) (Except for subdivisions) <br />be designed and constructed during the 0e / or subsequent construction season in the following manner (check one): <br />(Year) <br />❑ 1, As a City engineered and constructed project (eligible for assessment financing). <br />City agrees: <br />a) to perform engineering design, cost estimate, award of contract, construction inspection, and assessment tabulation for the <br />improvements; <br />b) to participate in the cost of necessary additional capacity of improvements beyond the assessable amounts as stipulated in <br />the Eugene Municipal Code. <br />Owner agrees: <br />a) to pay all engineering and construction costs which are not eligible for assessment financing. <br />b) if the undersigned owner chooses to discontinue the City engineering and construction process prior to execution of a <br />construction contract, the owner further agrees to pay all engineering and other project-related costs incurred by the City to <br />that point, and to comply with paragraph 2 below, if applicable. <br />2. As a privately engineered and constructed project with private financing arranged by the Owner. <br />Owner agrees: <br />a) to install all required public improvements at no cost to the City; <br />b) to pay actual City costs incurred for plan review and processing, inspection, materials testing, and other engineering <br />services, all of which will be billed and payable monthly with final payment due prior to City's final acceptance of the <br />completed improvements. <br />c) to provide the City a bond, which includes a one-year warranty period, in an amount sufficient to cover all engineering and <br />construction costs associated with completion of the required public improvements. <br />d) to pay other charges and levies for public improvements, if required. Other charges may include, but are not limited to: <br />1) penalty charges: in the event the property owner fails to make payment when due under this agreement, the property <br />owner shall be charged a penalty in the amount of $25 or ten percent (10%) of the past due amount, whichever is <br />greater. Payment of the penalty shall not constitute a waiver by the City of its other remedies. <br />2) interest charges: property owner shall pay interest on all past due amounts at the rate of eighteen percent (18%) per <br />annum from the due date until paid. This sum shall be in addition to penalty charges. <br />_2 tom 0- <br />ADDRESS <br />CITY / ?TATE / ZIP <br />PNONE NUMBER (business hours) <br />ADDRESS <br />CITY / STATE / ZIP <br />gl ~5L4 l i`,)46 <br />CUMBER (business hours) <br />101 E BROADWAY, SUITE 400 <br />EUGENE OREGON 97401 <br />
The URL can be used to link to this page
Your browser does not support the video tag.