(� � 11�4I�i� �) <br />J;i 1 <br />I141i�I <br />a division of Public Works <br />1820 Roosevelt Blvd. <br />Eugene, Oregon 97402 <br />Memorandum <br />Date: September 20, 2008 <br />To: Kurt Corey, PW Director <br />Johnny Medlin, POS Division Manager <br />From: Rob Hallett, Turf and Grounds Supervisor <br />Subject: Public Improvement Contract with Wildish Construction <br />(541) 682 -4800 <br />(541) 682-4882 Fax <br />www.ci.eugene.or.us/pw/parks <br />Attached is a Public Improvement Contract with Wildish Construction Company for your review and <br />approval. This memo gives an overview of the work that will be performed by Wildish pertaining to the <br />Laurelwood Golf Course cart path improvements. More specific details of construction are described in the <br />bid documents (Exhibit B) for this project. <br />The primary scope of this project is to remove and realign a portion (approx. 230 ft.) of the paved cart path <br />nearest to the club house heading down to fairway 41 and the driving range. Current grades and pavement <br />conditions make this section of path hazardous to navigate during wet weather. The new alignment design <br />calls for switch -backs to lessen path steepness. <br />This project is scheduled for completion by October 31, 2010. <br />Thank you for your time and consideration, <br />-Rob Hallett <br />�EUGENEr <br />