New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2011-05302 Cover Memo
COE
>
PW
>
POS_PWM
>
Contracts
>
2010 Contracts scanned to Verify
>
2011-05302 Cover Memo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2010 7:53:25 AM
Creation date
9/21/2010 3:55:18 PM
Metadata
Fields
Template:
PW_Contract
COE_Contract_Number
2011-05302
PW_Document_Type_Contract
Correspondence
Organization
Wildish Construction Company
PW_Department
Public Works
Contract_Administrator
Aanderud
Contract_Manager
Hallett, Rob
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(� � 11�4I�i� �) <br />J;i 1 <br />I141i�I <br />a division of Public Works <br />1820 Roosevelt Blvd. <br />Eugene, Oregon 97402 <br />Memorandum <br />Date: September 20, 2008 <br />To: Kurt Corey, PW Director <br />Johnny Medlin, POS Division Manager <br />From: Rob Hallett, Turf and Grounds Supervisor <br />Subject: Public Improvement Contract with Wildish Construction <br />(541) 682 -4800 <br />(541) 682-4882 Fax <br />www.ci.eugene.or.us/pw/parks <br />Attached is a Public Improvement Contract with Wildish Construction Company for your review and <br />approval. This memo gives an overview of the work that will be performed by Wildish pertaining to the <br />Laurelwood Golf Course cart path improvements. More specific details of construction are described in the <br />bid documents (Exhibit B) for this project. <br />The primary scope of this project is to remove and realign a portion (approx. 230 ft.) of the paved cart path <br />nearest to the club house heading down to fairway 41 and the driving range. Current grades and pavement <br />conditions make this section of path hazardous to navigate during wet weather. The new alignment design <br />calls for switch -backs to lessen path steepness. <br />This project is scheduled for completion by October 31, 2010. <br />Thank you for your time and consideration, <br />-Rob Hallett <br />�EUGENEr <br />
The URL can be used to link to this page
Your browser does not support the video tag.