<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />September 20, 2010 <br /> <br />CONTACT: <br />Danny Lima, Technical Specialist, 541-682-4800 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br />FOR IMMEDIATE RELEASE <br /> <br /> <br /> <br />Traffic Advisory <br />Rain Reschedules Paving Work that Will Slow Traffic on Bethel Drive <br /> <br />The paving of Bethel Drive between Highway 99 and Roosevelt Boulevard has been <br />rescheduled for Tuesday and Wednesday, September 21-22, in hopes that the weather will be <br />drier and more suitable for asphalt work. <br />Crews from Eugene Public Works Maintenance will be repairing about a half mile of <br />Bethel Drive between Wood Avenue and Allane Avenue. Traffic will be reduced to one lane, <br />controlled by flaggers, between 6 a.m. and 6 p.m. until the repairs are finished. Plans call for <br />work in the southbound lane on Tuesday, switching to the northbound lane on Wednesday, <br />weather permitting. <br />The work includes sweeping the street surface, applying a thin coat of a sticky sealant <br />and then applying a two-inch-thick layer of new asphalt. This type of work requires dry <br />pavement. Intersections and driveways, including access to the Red Cross, will be blocked <br />briefly while paving is occurring directly in front of those locations. <br />This repair work is funded through Eugene’s road fund, which comes primarily from the <br />city’s share of state gas taxes. For more information about this project and other surface repair <br />work and pothole patching, contact Eugene Public Works Maintenance at 541-682-4800 <br /> <br /># # # <br /> <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br />