New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
BethelDrive.docx
COE
>
PW
>
Admin
>
Public Affairs
>
2010
>
BethelDrive.docx
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2010 12:18:22 PM
Creation date
9/16/2010 12:18:21 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Maintenance
PW_Subject_Public_Affairs
Road Repairs
External_View
No
PWA_Release_Date
9/16/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />September 16, 2010 <br /> <br />CONTACT: <br />Danny Lima, Technical Specialist, 541-682-4800 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br />FOR IMMEDIATE RELEASE <br /> <br /> <br /> <br />Traffic Advisory <br />Paving Repairs Will Slow Traffic on Bethel Drive <br /> <br />Expect construction delays on Bethel Drive between Highway 99 and Roosevelt <br />Boulevard for several days beginning Monday, September 20. <br />Crews from Eugene Public Works Maintenance will be repairing about a half mile of <br />Bethel Drive between Wood Avenue and Allane Avenue. Traffic will be reduced to one lane, <br />controlled by flaggers, between 6 a.m. and 6 p.m. until the repairs are finished. Plans call for <br />work in the southbound lane on Monday, switching to the northbound lane on Tuesday, weather <br />permitting. <br />The work includes sweeping the street surface, applying a thin coat of a sticky sealant <br />and then applying a two-inch-thick layer of new asphalt. Intersections and driveways, including <br />access to the Red Cross, will be blocked briefly while paving is occurring directly in front of <br />those locations. <br />This repair work is funded through Eugene’s road fund, which comes primarily from the <br />city’s share of state gas taxes. For more information about this project and other surface repair <br />work and pothole patching, contact Eugene Public Works Maintenance at 541-682-4800 <br /> <br /># # # <br /> <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br />
The URL can be used to link to this page
Your browser does not support the video tag.