Budget Estimate <br />GJN 100018 (POS Delta Ponds: Interpretive Signs NOAA) <br />Item <br />Description <br />Amount <br />1 <br />Design of interpretive signs (primarily City staff) <br />$11,500 <br />2 <br />Fabrication and Installation of up to 10 signs (mostly contracted) <br />$20,000 <br />TOTAL <br />$31,500 <br />