Page 2 of 2 <br />Page Subtotal (From Page 1) $191,922.22 <br />Balzhiser & Hubbard (Surve <br />6/30/2007 <br />$1,464.50 <br />07/26/2007 <br />3,226.00 <br />07/31/2007 <br />3,799.00 <br />08/31/2007 <br />2,746.00 <br />08/31/2007 <br />1,147.50 <br />09/30/2007 <br />62.00 <br />02/29/2008 <br />5,459.25 <br />Subtotal B&E Survey <br />17,904.25 <br />Terra Science (Wetlands <br />07/07/2008 <br />$6,603.24 <br />07/07/2008 <br />6,611.12 <br />12/13/2008 <br />3,154.80 <br />12/13/2008 <br />3,072.00 <br />12/13/2008 <br />2,338.52 <br />Subtotal Terra Science <br />$21,779-68 <br />Total Consultant Charges <br />$231,606.15 <br />NOTES: <br />1) PiVOT's cost to design track portion of the Jeff/ATA project. (See attached) <br />