Engineering and Construction Agreement City oF Eugene <br />Public Works Engineering <br />1 858 Pearl Street <br />Job Number Contract Number Capital Project Number Eugene, OR 97401 <br />541.6825291 PHONE <br />541.6825032 FAX <br />The undersigned Owner requests the Public <br />Type of improvement. Construction of storm water <br />wastewater, stormwater, <br />as described below: <br />wastewater systems and concrete alley improvements <br />Location: Friendly Alley <br />(Stmetoreasement lfa subdivision, printsubdivislon name) <br />North or east limit: West 27th Avenue <br />(&ceptforsubdivislons) . <br />South or west limit: West 28th Avenue <br />fFxceptforsubdivistons) <br />be designed and constructed during the 2010 or subsequent construction season in the following manner (check one): <br />(rear) <br />E] 1. As a City engineered and constructed prof <br />City agrees: <br />(a) to performengineedrig design, cost estimate, <br />(b) to participate in the cost of necessary additloi <br />Mudcpal Code. <br />Owner agrees: <br />(a) to pay all engineering and construction costs <br />(b) if the undersigned owner chooses to disconti <br />contract, the owner further agrees to pay all e <br />paragraph 2 below, if applicable. <br />Z 2. As a privately engineered and constructed <br />with private financing arranged by the Owner. <br />Owner agrees: . <br />(a) to install all required public improvements at no cost to the City; _ <br />(b) to pay actual City costs incurred for plan review and processing, inspection, materials testing, and other engineering services, all of which <br />will be billed and payable monthly with final payment due prior to City's final acceptance of the completed Improvements. <br />(c) to provid ethe City a bond, which includes a one-year warranty period, in an amount sufficient to cover all engineering and construction <br />costs associated with completion of the required public improvements. <br />(d) to pay other charges and levies for public improvements; if required. Other charges may include, but are not limited to: <br />1) penalty charges: in the event the property oyvner fails to make payment when•due underthis agreement, the property owner shall be <br />charged a penalty in the amount of $25 or ten percent (10%) of the past due amount, whichever is greater. Payment of the penalty shall <br />not constitute a waiver by.the City of its other remedies. <br />2) interest charges: property owner shall pay interest on all past due amounts at the rate of eighteen percent (18%) per annum from the <br />due date until paid. This sum shall be in ad#ion to penalty charges. <br />PROPERTY OWNER <br />PHU-im ONNm WMA@ <br />DATE .1 <br />31 D W ILSDA OV J <br />ADDRESS <br />A, L' <br />PHDN'_ N LWMWd-= hours) <br />CO-OWNER <br />CITY OF EUGENE <br />co•omsrss"ATM SIGNATURE <br />CO-OWNER':NAw <br />DATE <br />ADDRM <br />Zeligible for assessment financing). <br />rd of contract, construction inspection, and assessment tabulation for the Improvements; <br />apacity of improvements beyond the assessable amounts as stipulated In the Eugene <br />:h are not eligible for assessment financing. <br />the City engineering and construction process prior to execution of a construction <br />leering and project related costs incurred by the City to that point, and to comply with <br />URE <br />DATE <br />777 Pearl Street <br />Eugene, OR 97401 <br />Original to the Gty ofEugene <br />Copies to Owner,-Co-owner, and Inspector <br />