New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
AJE71524 Annual Erosion Permit FY11
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2011
>
AJE71524 Annual Erosion Permit FY11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2011 2:23:47 AM
Creation date
8/9/2010 3:49:14 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Journal Entry
PW_Active
Yes
External_View
No
GJN
004668
GL_Project_Number
905482
Identification_Number
71524
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br />~t c~ c _00 s PUBLIC WORKS <br />9,325 I o~ 51 J56 4'37-5 - `2 l Engineering <br />99 W 10th Ave, Suite240 <br />541.682.8498 <br />541.682.5593 FAX <br />www.eugene-or.gov/erosion <br />U <br />July 26, 2010 <br />'CITY OF EUGENE - PW ENGINEERING <br />99 E BROADWAY <br />EUGENE, OR 97401 <br />Site address: 640 GOODPASTURE ISLAND RD <br />Total fees due for permit # 04-04615-01 are $405.00 <br />SUBJECT. EROSION PERMIT ANNUAL COMPLIANCE FEE NOTICE <br />Dear Customer: <br />531- 9 33 ? - Z -965 432 <br />Our records indicate you currently have an active erosion permit. There is an Annual Compliance Fee <br />(Administrative Order No. 58-03-04-F) for building sites that need to extend construction beyond a 12 month <br />time frame. The purpose of this fee is to recover costs associated with the on-going monitoring required to <br />ensure each site is meeting the required ersosion prevention outcomes. <br />The Annual Compliance fee is one half of the original permit fee. For example, if your original permit cost $120.00, <br />the Annual Compliance Fee is $60.00. Note that a(n) 8% administrative fee is charged to the total of all fees <br />collected. The total fee payment due on your permit is listed above. <br />Payment is due within 30 days of the above date, and may be made in person at the Permit and Information <br />Center located at 99 W. 10th Ave. during regular business hours, or by mail to: <br />City of Eugene <br />99 W. 10th Ave. <br />Eugene, OR 97401 <br />Please make checks payable to the City of Eugene and include the permit number shown above with your check. <br />Failure to pay the annual compliance fee of $405.00 within 30 days of the date of this letter will <br />result in this matter being submitted to the Finance Department for further collection and may be <br />referred to a collection agency. <br />You may avoid the annual compliance fees by "finalizing" your permit. The site must be completely stabilized and <br />all erosion control measures removed from the site. Once this is complete you can call for an inspection request <br />and schedule a final inspection of the site. If the final inspection is approved the permit will be "finalized" and no <br />payment of fees will be required. Upon the completion of the final inspection the inspector will contact you with the <br />result of the inspection. <br />If you have any questions regarding this information or would like to schedule an inspection please contact <br />Steve Norris at 541-682-8423 or Ed Fredette at 541-682-8471. <br />JUL 2 7 2010 <br />Annual Compliance Fee Notice Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.