City <br />of Eugene <br />Bid <br />Tabulation <br />Bid # <br />2010-000020 <br />Job N <br />o. 93-004693 <br />2010 <br />Open Trench Wastewater Rehabilitation at Various <br />Locations <br />Engineer's <br />Estimate <br />Eugene Sand <br />Construction <br />Wildish Construction <br />Kipco, <br />Inc. <br />H & J Construction <br />Line <br />No. <br />Description <br />uantit <br />Unit <br />Unit Price <br />Amount <br />Unit Price <br />Amount <br />Unit Price <br />Amount <br />Unit Price <br />Amount <br />Unit Price <br />Amount <br />10 <br />MOBILIZATION <br />1 <br />LUMPSUM <br />$55,000.00 <br />$55,000.00 <br />$39,500.00 <br />$39,500.00 <br />$50,000.00 <br />$50,000.00 <br />$40,000.00 <br />$40,000.00 <br />$20,000.00 <br />$20,000.00 <br />20 <br />FLAGGERS <br />60 <br />HOUR <br />$50.00 <br />$3,000.00 <br />$45.00 <br />$2,700.00 <br />$43.00 <br />$2,580.00 <br />$40.00 <br />$2,400.00 <br />$48.00 <br />$2,880.00 <br />30 <br />TEMP. PROTECTION AND DIRECTION OF TRAFFIC <br />1 <br />LUMPSUM <br />$4,000.00 <br />$4,000.00 <br />$6,000.00 <br />$6,000.00 <br />$13,000.00 <br />$13,000.00 <br />$3,408.00 <br />$3,408.00 <br />$7,400.00 <br />$7,400.00 <br />40 <br />EROSION CONTROL <br />1 <br />LUMPSUM <br />$2,500.00 <br />$2,500.00 <br />$500.00 <br />$500.00 <br />$2,000.00 <br />$2,000.00 <br />$400.00 <br />$400.00 <br />$2,000.00 <br />$2,000.00 <br />50 <br />ROCK EXCAVATION <br />150 <br />CUYD <br />$50.00 <br />$7,500.00 <br />$30.00 <br />$4,500.00 <br />$1.00 <br />$150.00 <br />$50.00 <br />$7,500.00 <br />$150.00 <br />$22,500.00 <br />60 <br />DYE TEST AND CONNECTION VERIFICATION <br />44 <br />EACH <br />$250.00 <br />$11,000.00 <br />$130.00 <br />$5,720.00 <br />$200.00 <br />$8,800.00 <br />$150.00 <br />$6,600.00 <br />$150.00 <br />$6,600.00 <br />70 <br />PIPE BURSTING AND HDPE LINER, 8 INCH <br />141 <br />FOOT <br />$50.00 <br />$7,050.00 <br />$50.00 <br />$7,050.00 <br />$90.00 <br />$12,690.00 <br />$30.00 <br />$4,230.00 <br />$54.00 <br />$7,614.00 <br />80 <br />TV INSPECT AND LOCATE SERVICE LINE <br />15 <br />EACH <br />$250.00 <br />$3,750.00 <br />$300.00 <br />$4,500.00 <br />$200.00 <br />$3,000.00 <br />$100.00 <br />$1,500.00 <br />$100.00 <br />$1,500.00 <br />90 <br />VIDEO INSPECTION <br />1 <br />LUMPSUM <br />$10,000.00 <br />$10,000.00 <br />$4,500.00 <br />$4,500.00 <br />$4,000.00 <br />$4,000.00 <br />$10,000.00 <br />$10,000.00 <br />$4,000.00 <br />$4,000.00 <br />100 <br />6 INCH PVC WASTEWATER PIPE <br />596 <br />FOOT <br />$32.00 <br />$19,072.00 <br />$39.00 <br />$23,244.00 <br />$60.00 <br />$35,760.00 <br />$52.00 <br />$30,992.00 <br />$37.00 <br />$22,052.00 <br />110 <br />6 INCH C900 PIPE <br />197 <br />FOOT <br />$42.00 <br />$8,274.00 <br />$39.00 <br />$7,683.00 <br />$60.00 <br />$11,820.00 <br />$42.00 <br />$8,274.00 <br />$39.00 <br />$7,683.00 <br />120 <br />8 INCH PVC PIPE <br />2318 <br />FOOT <br />$34.00 <br />$78,812.00 <br />$76.00 <br />$176,168.00 <br />$65.00 <br />$150,670.00 <br />$65.00 <br />$150,670.00 <br />$56.50 <br />$130,967.00 <br />130 <br />8 INCH C900 PIPE <br />563 <br />FOOT <br />$42.00 <br />$23,646.00 <br />$72.00 <br />$40,536.00 <br />$64.00 <br />$36,032.00 <br />$60.00 <br />$33,780.00 <br />$60.00 <br />$33,780.00 <br />140 <br />CLEANOUT 6 INCH <br />3 <br />EACH <br />$350.00 <br />$1,050.00 <br />$325.00 <br />$975.00 <br />$200.00 <br />$600.00 <br />$120.00 <br />$360.00 <br />$350.00 <br />$1,050.00 <br />150 <br />PIPE REPAIR - 30" STORM DRAIN PIPE <br />1 <br />LUMPSUM <br />$2,250.00 <br />$2,250.00 <br />$3,000.00 <br />$3,000.00 <br />$750.00 <br />$750.00 <br />$2,000.00 <br />$2,000.00 <br />$1,500.00 <br />$1,500.00 <br />160 <br />CONCRETE MANHOLE, WASTEWATER <br />2 <br />EACH <br />$1,800.00 <br />$3,600.00 <br />$2,000.00 <br />$4,000.00 <br />$2,400.00 <br />$4,800.00 <br />$2,600.00 <br />$5,200.00 <br />$2,500.00 <br />$5,000.00 <br />170 <br />CONCRETE MANHOLE, FLAT TOP WASTEWATER <br />2 <br />EACH <br />$1,600.00 <br />$3,200.00 <br />$1,800.00 <br />$3,600.00 <br />$2,000.00 <br />$4,000.00 <br />$2,000.00 <br />$4,000.00 <br />$2,000.00 <br />$4,000.00 <br />180 <br />CORE INTO EXISTING MANHOLE <br />2 <br />EACH <br />$400.00 <br />$800.00 <br />$400.00 <br />$800.00 <br />$500.00 <br />$1,000.00 <br />$450.00 <br />$900.00 <br />$350.00 <br />$700.00 <br />190 <br />MINOR ADJUSTMENT OF MANHOLES <br />5 <br />EACH <br />$350.00 <br />$1,750.00 <br />$350.00 <br />$1,750.00 <br />$200.00 <br />$1,000.00 <br />$250.00 <br />$1,250.00 <br />$400.00 <br />$2,000.00 <br />200 <br />MAJOR ADJUSTMENT OF MANHOLES <br />1 <br />EACH <br />$650.00 <br />$650.00 <br />$500.00 <br />$500.00 <br />$800.00 <br />$800.00 <br />$800.00 <br />$800.00 <br />$1,500.00 <br />$1,500.00 <br />210 <br />ADJUST MANHOLE CHANNEL <br />1 <br />EACH <br />$350.00 <br />$350.00 <br />$500.00 <br />$500.00 <br />$800.00 <br />$800.00 <br />$250.00 <br />$250.00 <br />$500.00 <br />$500.00 <br />220 <br />POTHOLE <br />8 <br />EACH <br />$500.00 <br />$4,000.00 <br />$500.00 <br />$4,000.00 <br />$600.00 <br />$4,800.00 <br />$300.00 <br />$2,400.00 <br />$500.00 <br />$4,000.00 <br />230 <br />RECONNECT SERVICE LINE <br />69 <br />EACH <br />$500.00 <br />$34,500.00 <br />$100.00 <br />$6,900.00 <br />$100.00 <br />$6,900.00 <br />$500.00. <br />$34,500.00 <br />$500.00 <br />$34,500.00 <br />240 <br />RECONSTRUCT EXISTING EXTERIOR DROP <br />2 <br />EACH <br />$750.00 <br />$1,500.00 <br />$1,000.00 <br />$2,000.00 <br />$1,000.00 <br />$2,000.00 <br />$500.00 <br />$1,000.00 <br />$1,500.00 <br />$3,000.00 <br />250 <br />CONNECTION TO EXISTING STRUCTURES <br />26 <br />EACH <br />$300.00 <br />$7,800.00 <br />$125.00 <br />$3,250.00 <br />$200.00 <br />$5,200.00 <br />$100.00 <br />$2,600.00 <br />$300.00 <br />$7,800.00 <br />260 <br />REM/REPL MH LID W/WATER TIGHT LID - WW <br />1 <br />EACH <br />$300.00 <br />$300.00 <br />$600.00 <br />$600.00 <br />$400.00 <br />$400.00 <br />$400.00 <br />$400.00 <br />$400.00 <br />$400.00 <br />270 <br />HMAC TRENCH PATCH <br />420 <br />TON <br />$250.00 <br />$105,000.00 <br />$1.00 <br />$420.00 <br />$70.00 <br />$29,400.00 <br />$100.00 <br />$42,000.00 <br />$175.00 <br />$73,500.00 <br />280 <br />LANDSCAPING <br />1 <br />LUMPSUM <br />$3,500.00 <br />$3,500.00 <br />$5,000.00 <br />$5,000.00 <br />$2,000.00 <br />$2,000.00 <br />$5,000.00 <br />$5,000.00 <br />$10,000.00 <br />$10,000.00 <br />290 <br />REMOVE AND REPLACE CONCRETE CURB AND GUTTER <br />170 <br />FOOT <br />$45.00 <br />$7,650.00 <br />$30.00 <br />$5,100.00 <br />$35.00 <br />$5,950.00 <br />$28.00 <br />$4,760.00 <br />$50.00 <br />$8,500.00 <br />300 <br />AGGREGATE BASE <br />65 <br />TON <br />$40.00 <br />$2,600.00 <br />$32.00 <br />$2,080.00 <br />$40.00 <br />$2,600.00 <br />$45.00 <br />$2,925.00 <br />$15.00 <br />$975.00 <br />310 <br />CONCRETE CLEANOUT APRON <br />1 <br />EACH <br />$200.00 <br />$200.00 <br />$150.00 <br />$150.00 <br />$350.00 <br />$350.00 <br />$250.00 <br />$250.00 <br />$300.00 <br />$300.00 <br />320 <br />CONCRETE MANHOLE APRON <br />10 <br />EACH <br />$250.00 <br />$2,500.00 <br />$250.00 <br />$2,500.00 <br />$400.00 <br />$4,000.00 <br />$550.00 <br />$5,500.00 <br />$400.00 <br />$4,000.00 <br />330 <br />5" CONCRETE SURFACING <br />415 <br />SQFT <br />$9.00 <br />$3,735.00 <br />$9.00 <br />$3,735.00 <br />$8.50 <br />$3,527.50 <br />$6.60 <br />$2,739.00 <br />$8.00 <br />$3,320.00 <br />340 <br />7" CONCRETE SURFACING <br />180 <br />SQFT <br />$10.00 <br />$1,800.00 <br />$13.00 <br />$2,340.00 <br />$19.00 <br />$3,420.00 <br />$11.00 <br />$1,980.00 <br />$10.00 <br />$1,800.00 <br />350 <br />RE-INFORCED CONCRETE PAVEMENT 7" THICK <br />886 <br />SQFT <br />$13.00 <br />$11,518.00 <br />$11.00 <br />$9,746.00 <br />$12.00 <br />$10,632.00 <br />$12.00 <br />$10,632.00 <br />$12.00 <br />$10,632.00 <br />360 <br />TREE PROTECTION ROOT ZONE EXCAVATION <br />24 <br />HOUR <br />$120.00 <br />$2,880.00 <br />$350.00 <br />$8,400.00 <br />$300.00 <br />$7,200.00 <br />$200.00 <br />$4,800.00 <br />$300.00 <br />$7,200.00 <br />370 <br />TREE PROTECTION FENCING <br />210 <br />FOOT <br />$3.50 <br />$735.00 <br />$4.00 <br />$840.00 <br />$6.00 <br />$1,260.00 <br />$2.00 <br />$420.00 <br />$2.00 <br />$420.00 <br />380 <br />REMOVE TREE <br />1 <br />EACH <br />$150.00 <br />$150.00 <br />$300.00 <br />$300.00 <br />$500.00 <br />$500.00 <br />$500.00 <br />$500.00 <br />$200.00 <br />$200.00 <br />Grand <br />Total: <br />$437,622.00 <br />$395,087.00 <br />$434,391.50 <br />$436,920.00 <br />$455,773.00 <br />