City
<br />of Eugene
<br />Bid
<br />Tabulation
<br />Bid #
<br />2010-000020
<br />Job N
<br />o. 93-004693
<br />2010
<br />Open Trench Wastewater Rehabilitation at Various
<br />Locations
<br />Engineer's
<br />Estimate
<br />Eugene Sand
<br />Construction
<br />Wildish Construction
<br />Kipco,
<br />Inc.
<br />H & J Construction
<br />Line
<br />No.
<br />Description
<br />uantit
<br />Unit
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />Unit Price
<br />Amount
<br />10
<br />MOBILIZATION
<br />1
<br />LUMPSUM
<br />$55,000.00
<br />$55,000.00
<br />$39,500.00
<br />$39,500.00
<br />$50,000.00
<br />$50,000.00
<br />$40,000.00
<br />$40,000.00
<br />$20,000.00
<br />$20,000.00
<br />20
<br />FLAGGERS
<br />60
<br />HOUR
<br />$50.00
<br />$3,000.00
<br />$45.00
<br />$2,700.00
<br />$43.00
<br />$2,580.00
<br />$40.00
<br />$2,400.00
<br />$48.00
<br />$2,880.00
<br />30
<br />TEMP. PROTECTION AND DIRECTION OF TRAFFIC
<br />1
<br />LUMPSUM
<br />$4,000.00
<br />$4,000.00
<br />$6,000.00
<br />$6,000.00
<br />$13,000.00
<br />$13,000.00
<br />$3,408.00
<br />$3,408.00
<br />$7,400.00
<br />$7,400.00
<br />40
<br />EROSION CONTROL
<br />1
<br />LUMPSUM
<br />$2,500.00
<br />$2,500.00
<br />$500.00
<br />$500.00
<br />$2,000.00
<br />$2,000.00
<br />$400.00
<br />$400.00
<br />$2,000.00
<br />$2,000.00
<br />50
<br />ROCK EXCAVATION
<br />150
<br />CUYD
<br />$50.00
<br />$7,500.00
<br />$30.00
<br />$4,500.00
<br />$1.00
<br />$150.00
<br />$50.00
<br />$7,500.00
<br />$150.00
<br />$22,500.00
<br />60
<br />DYE TEST AND CONNECTION VERIFICATION
<br />44
<br />EACH
<br />$250.00
<br />$11,000.00
<br />$130.00
<br />$5,720.00
<br />$200.00
<br />$8,800.00
<br />$150.00
<br />$6,600.00
<br />$150.00
<br />$6,600.00
<br />70
<br />PIPE BURSTING AND HDPE LINER, 8 INCH
<br />141
<br />FOOT
<br />$50.00
<br />$7,050.00
<br />$50.00
<br />$7,050.00
<br />$90.00
<br />$12,690.00
<br />$30.00
<br />$4,230.00
<br />$54.00
<br />$7,614.00
<br />80
<br />TV INSPECT AND LOCATE SERVICE LINE
<br />15
<br />EACH
<br />$250.00
<br />$3,750.00
<br />$300.00
<br />$4,500.00
<br />$200.00
<br />$3,000.00
<br />$100.00
<br />$1,500.00
<br />$100.00
<br />$1,500.00
<br />90
<br />VIDEO INSPECTION
<br />1
<br />LUMPSUM
<br />$10,000.00
<br />$10,000.00
<br />$4,500.00
<br />$4,500.00
<br />$4,000.00
<br />$4,000.00
<br />$10,000.00
<br />$10,000.00
<br />$4,000.00
<br />$4,000.00
<br />100
<br />6 INCH PVC WASTEWATER PIPE
<br />596
<br />FOOT
<br />$32.00
<br />$19,072.00
<br />$39.00
<br />$23,244.00
<br />$60.00
<br />$35,760.00
<br />$52.00
<br />$30,992.00
<br />$37.00
<br />$22,052.00
<br />110
<br />6 INCH C900 PIPE
<br />197
<br />FOOT
<br />$42.00
<br />$8,274.00
<br />$39.00
<br />$7,683.00
<br />$60.00
<br />$11,820.00
<br />$42.00
<br />$8,274.00
<br />$39.00
<br />$7,683.00
<br />120
<br />8 INCH PVC PIPE
<br />2318
<br />FOOT
<br />$34.00
<br />$78,812.00
<br />$76.00
<br />$176,168.00
<br />$65.00
<br />$150,670.00
<br />$65.00
<br />$150,670.00
<br />$56.50
<br />$130,967.00
<br />130
<br />8 INCH C900 PIPE
<br />563
<br />FOOT
<br />$42.00
<br />$23,646.00
<br />$72.00
<br />$40,536.00
<br />$64.00
<br />$36,032.00
<br />$60.00
<br />$33,780.00
<br />$60.00
<br />$33,780.00
<br />140
<br />CLEANOUT 6 INCH
<br />3
<br />EACH
<br />$350.00
<br />$1,050.00
<br />$325.00
<br />$975.00
<br />$200.00
<br />$600.00
<br />$120.00
<br />$360.00
<br />$350.00
<br />$1,050.00
<br />150
<br />PIPE REPAIR - 30" STORM DRAIN PIPE
<br />1
<br />LUMPSUM
<br />$2,250.00
<br />$2,250.00
<br />$3,000.00
<br />$3,000.00
<br />$750.00
<br />$750.00
<br />$2,000.00
<br />$2,000.00
<br />$1,500.00
<br />$1,500.00
<br />160
<br />CONCRETE MANHOLE, WASTEWATER
<br />2
<br />EACH
<br />$1,800.00
<br />$3,600.00
<br />$2,000.00
<br />$4,000.00
<br />$2,400.00
<br />$4,800.00
<br />$2,600.00
<br />$5,200.00
<br />$2,500.00
<br />$5,000.00
<br />170
<br />CONCRETE MANHOLE, FLAT TOP WASTEWATER
<br />2
<br />EACH
<br />$1,600.00
<br />$3,200.00
<br />$1,800.00
<br />$3,600.00
<br />$2,000.00
<br />$4,000.00
<br />$2,000.00
<br />$4,000.00
<br />$2,000.00
<br />$4,000.00
<br />180
<br />CORE INTO EXISTING MANHOLE
<br />2
<br />EACH
<br />$400.00
<br />$800.00
<br />$400.00
<br />$800.00
<br />$500.00
<br />$1,000.00
<br />$450.00
<br />$900.00
<br />$350.00
<br />$700.00
<br />190
<br />MINOR ADJUSTMENT OF MANHOLES
<br />5
<br />EACH
<br />$350.00
<br />$1,750.00
<br />$350.00
<br />$1,750.00
<br />$200.00
<br />$1,000.00
<br />$250.00
<br />$1,250.00
<br />$400.00
<br />$2,000.00
<br />200
<br />MAJOR ADJUSTMENT OF MANHOLES
<br />1
<br />EACH
<br />$650.00
<br />$650.00
<br />$500.00
<br />$500.00
<br />$800.00
<br />$800.00
<br />$800.00
<br />$800.00
<br />$1,500.00
<br />$1,500.00
<br />210
<br />ADJUST MANHOLE CHANNEL
<br />1
<br />EACH
<br />$350.00
<br />$350.00
<br />$500.00
<br />$500.00
<br />$800.00
<br />$800.00
<br />$250.00
<br />$250.00
<br />$500.00
<br />$500.00
<br />220
<br />POTHOLE
<br />8
<br />EACH
<br />$500.00
<br />$4,000.00
<br />$500.00
<br />$4,000.00
<br />$600.00
<br />$4,800.00
<br />$300.00
<br />$2,400.00
<br />$500.00
<br />$4,000.00
<br />230
<br />RECONNECT SERVICE LINE
<br />69
<br />EACH
<br />$500.00
<br />$34,500.00
<br />$100.00
<br />$6,900.00
<br />$100.00
<br />$6,900.00
<br />$500.00.
<br />$34,500.00
<br />$500.00
<br />$34,500.00
<br />240
<br />RECONSTRUCT EXISTING EXTERIOR DROP
<br />2
<br />EACH
<br />$750.00
<br />$1,500.00
<br />$1,000.00
<br />$2,000.00
<br />$1,000.00
<br />$2,000.00
<br />$500.00
<br />$1,000.00
<br />$1,500.00
<br />$3,000.00
<br />250
<br />CONNECTION TO EXISTING STRUCTURES
<br />26
<br />EACH
<br />$300.00
<br />$7,800.00
<br />$125.00
<br />$3,250.00
<br />$200.00
<br />$5,200.00
<br />$100.00
<br />$2,600.00
<br />$300.00
<br />$7,800.00
<br />260
<br />REM/REPL MH LID W/WATER TIGHT LID - WW
<br />1
<br />EACH
<br />$300.00
<br />$300.00
<br />$600.00
<br />$600.00
<br />$400.00
<br />$400.00
<br />$400.00
<br />$400.00
<br />$400.00
<br />$400.00
<br />270
<br />HMAC TRENCH PATCH
<br />420
<br />TON
<br />$250.00
<br />$105,000.00
<br />$1.00
<br />$420.00
<br />$70.00
<br />$29,400.00
<br />$100.00
<br />$42,000.00
<br />$175.00
<br />$73,500.00
<br />280
<br />LANDSCAPING
<br />1
<br />LUMPSUM
<br />$3,500.00
<br />$3,500.00
<br />$5,000.00
<br />$5,000.00
<br />$2,000.00
<br />$2,000.00
<br />$5,000.00
<br />$5,000.00
<br />$10,000.00
<br />$10,000.00
<br />290
<br />REMOVE AND REPLACE CONCRETE CURB AND GUTTER
<br />170
<br />FOOT
<br />$45.00
<br />$7,650.00
<br />$30.00
<br />$5,100.00
<br />$35.00
<br />$5,950.00
<br />$28.00
<br />$4,760.00
<br />$50.00
<br />$8,500.00
<br />300
<br />AGGREGATE BASE
<br />65
<br />TON
<br />$40.00
<br />$2,600.00
<br />$32.00
<br />$2,080.00
<br />$40.00
<br />$2,600.00
<br />$45.00
<br />$2,925.00
<br />$15.00
<br />$975.00
<br />310
<br />CONCRETE CLEANOUT APRON
<br />1
<br />EACH
<br />$200.00
<br />$200.00
<br />$150.00
<br />$150.00
<br />$350.00
<br />$350.00
<br />$250.00
<br />$250.00
<br />$300.00
<br />$300.00
<br />320
<br />CONCRETE MANHOLE APRON
<br />10
<br />EACH
<br />$250.00
<br />$2,500.00
<br />$250.00
<br />$2,500.00
<br />$400.00
<br />$4,000.00
<br />$550.00
<br />$5,500.00
<br />$400.00
<br />$4,000.00
<br />330
<br />5" CONCRETE SURFACING
<br />415
<br />SQFT
<br />$9.00
<br />$3,735.00
<br />$9.00
<br />$3,735.00
<br />$8.50
<br />$3,527.50
<br />$6.60
<br />$2,739.00
<br />$8.00
<br />$3,320.00
<br />340
<br />7" CONCRETE SURFACING
<br />180
<br />SQFT
<br />$10.00
<br />$1,800.00
<br />$13.00
<br />$2,340.00
<br />$19.00
<br />$3,420.00
<br />$11.00
<br />$1,980.00
<br />$10.00
<br />$1,800.00
<br />350
<br />RE-INFORCED CONCRETE PAVEMENT 7" THICK
<br />886
<br />SQFT
<br />$13.00
<br />$11,518.00
<br />$11.00
<br />$9,746.00
<br />$12.00
<br />$10,632.00
<br />$12.00
<br />$10,632.00
<br />$12.00
<br />$10,632.00
<br />360
<br />TREE PROTECTION ROOT ZONE EXCAVATION
<br />24
<br />HOUR
<br />$120.00
<br />$2,880.00
<br />$350.00
<br />$8,400.00
<br />$300.00
<br />$7,200.00
<br />$200.00
<br />$4,800.00
<br />$300.00
<br />$7,200.00
<br />370
<br />TREE PROTECTION FENCING
<br />210
<br />FOOT
<br />$3.50
<br />$735.00
<br />$4.00
<br />$840.00
<br />$6.00
<br />$1,260.00
<br />$2.00
<br />$420.00
<br />$2.00
<br />$420.00
<br />380
<br />REMOVE TREE
<br />1
<br />EACH
<br />$150.00
<br />$150.00
<br />$300.00
<br />$300.00
<br />$500.00
<br />$500.00
<br />$500.00
<br />$500.00
<br />$200.00
<br />$200.00
<br />Grand
<br />Total:
<br />$437,622.00
<br />$395,087.00
<br />$434,391.50
<br />$436,920.00
<br />$455,773.00
<br />
|