200912010 SRTS Infrastructure Grant Application <br />Conc. <br />Concrete Ped Sidewalk cost Covered Bike Traffic Erosion <br />Speed Reader Continental Pavement Wayfinding refugetBUmp per f (adjat Parking Raised Element MONfrtabcn Control Control Engineering SITE <br />School LISt fPraleds Orcrlnann SfiMer Flaxh Rnard frneeinn McINIiMNnn maHirvw T_fin 'i_ ,nn en ,.e .,,~,w -M„ ooh TnTAI ,roc - , snot 7nTAl <br />Roosevelt Middle <br />School <br />30'Avenue Crossing Improvements <br />Stutter flesh atAiderf301h on west leg <br />Ped refu <br />e on east le <br />of with marked <br />QUANTITY <br />2 <br />2 <br />4 <br />1 <br />at Alder Street <br />g <br />g <br />crosswalk and no auto impact <br />COST <br />31000.00 <br />$ <br />$ 1600.00 <br />E <br />$ 1.880.00 <br />$ <br />$ 5000.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ 39480,00 <br />3948 <br />789.6 <br />3948 <br />11844 <br />$ 56,456.40 <br />28th and Hiyard Crossing <br />Stutter flash, marked crossing, and bump <br />1 <br />1 <br />1 <br />4 <br />1 <br />25 <br />50 <br />Improvements <br />out on southeast comer <br />15500.00 <br />800.00 <br />5000.00 <br />1880,00 <br />5000.00 <br />375.00 <br />275.00 <br />V1720.00 <br />30 <br />550.00 <br />3055 <br />611 <br />305.5 <br />9165 <br />43686.50 <br />Alder Corridor (24"to 30th) <br />Bicycle boulevard wayfinding signage and <br />0 <br />4 <br />4 <br />12 <br />pavement markings <br />800,00 <br />1880.00 <br />6360.00 <br />9040.00 <br />904 <br />180.8 <br />90.4 <br />2712 <br />1292710 <br />Bike Parking <br />60 hoops to complete bike parking <br />0 <br />60 <br />project already underway <br />9000.00 <br />9000.00 <br />900 <br />180 <br />90 <br />27001 <br />$ 2870.00 <br />Monroe Middle <br />School <br />Oakway Road and Lariat Meadows <br />Petl refuge and marked crosswalk <br />1 <br />1 <br />4 <br />1 <br />Crosswalk treatment <br />800.00 <br />5000.00 <br />1880.00 <br />5000.00 <br />1268080 <br />1268 <br />253.6 <br />126.8 <br />3804 <br />18132.40 <br />Oakway Road and Bedford Way: <br />Ped refu <br />e and marked crosswalk <br />1 <br />1 <br />4 <br />1 <br />Crosswalktrearmem <br />g <br />800.00 <br />5000.00 <br />1880,00 <br />5000.00 <br />12680.00 <br />1266 <br />253.6 <br />126.8 <br />3804 <br />18132.40 <br />Wllakenae at Bogart Crosswalk <br />pad refuge and marked crosswalk <br />1 <br />4 <br />1 <br />treatment <br />600.00 <br />1880.00 <br />5000.00 <br />7680.00 <br />768 <br />15306 <br />7608 <br />2304 <br />10982.40 <br />Van and Roundup connection path <br />Pave graveVdirt cut-thm <br />ath <br />2 <br />1140 <br />2 <br />p <br />940.00 <br />6270.00 <br />1720.00 <br />8,930.00 <br />893 <br />178.6 <br />89.3 <br />2679 <br />12 769.90 <br />Monroe Middle School area <br />WayfindingrPed Cut-Thru signage for cul <br />0 <br />18, <br />de sac pathways and wayfinding <br />9,540.00 <br />9,540.00 <br />954 <br />190.8 <br />95.4 <br />2862 <br />13 642.20 <br />Edison Elementary <br />School <br />22 nd Ave AVe entlAgate le Street <br />22 <br />Str t <br />Stutter flesh s <br />stem and si <br />na <br />e <br />1 <br />1 <br />2 <br />Crosswalk <br />y <br />g <br />g <br />15500.00 <br />5000.00 <br />940.00 <br />21440.00 <br />2144 <br />428.8 <br />214.4 <br />6432 <br />30659.20 <br />23s Ave and Hams: Crosswalk <br />t <br />t <br />t <br />Crosswalk marking across Harris (ms leg) <br />1 <br />men <br />rea <br />800,00 <br />800.00 <br />80 <br />its <br />B <br />240 <br />1144.00 <br />22nd and 23rd at Onyx and Emerald <br />School crosswalk markings <br />12 <br />1 <br />9600.00 <br />9,600.00 <br />960 <br />192 <br />96 <br />28801 <br />$ 13.728.00 <br />Cabman Ridge <br />Elementary School <br />Harris, University, Potter and 29th <br />School mossrrolkmardn <br />s <br />5 <br />Ave <br />g <br />4000.00 <br />4000.00 <br />400 <br />80 <br />40 <br />1200 <br />5720,00 <br />Bike Parking <br />30 hoops <br />30 <br />V <br />4500.00 <br />4500.00 <br />450 <br />90 <br />45 <br />1350 <br />6435.00 <br />Casa, Chavez <br />Elementary School <br />14th and Chambers (south leg) <br />Replace marked crosswalk at 15th to a <br />new one at 14th to better ali <br />n with <br />1 <br />2 <br />g <br />school access <br />800.00 <br />940.00 <br />1740.00 <br />174 <br />34.8 <br />17.4 <br />522 <br />2488.20 <br />18th and Friendly Street <br />Crossing improvements: stutter flesh and <br />1.00 <br />1.00 <br />2.00 <br />continental crosswalk marking (westleg) <br />15500.00 <br />800.00 <br />940.00 <br />17 40.00 <br />1724 <br />344.8 <br />1728 <br />5172 <br />2465320 <br />Elemena <br />Elementary ry ry School <br />Todd and Coventry: Ped Cut- <br />Complete sidewalk segment to align with <br />2 <br />2 <br />10 <br />200 <br />1 <br />through <br />marked crossing across Todd Street <br />1600.00 <br />940.00 <br />150,00 <br />1100.00 <br />860.00 <br />4650.00 <br />465 <br />93 <br />46.5 <br />1395 <br />6649.50 <br />Path Paving <br />Western Easement Concrete Walkway <br />lum sum <br />9,955.00 <br />9955.00 <br />995.5 <br />199.1 <br />99.55 <br />298605 <br />14235.65 <br />Path Improvement <br />Gravel Access Path <br />lump surn <br />10180.00 <br />10180.00 <br />1018 <br />2016 <br />101.8 <br />3054 <br />14 557.40 <br />Path Paving <br />Parking lot driveway b <br />ass <br />lump surn <br />yp <br />9,985.00 <br />9985.00 <br />9985 <br />199.7 <br />99.85 <br />2995.5 <br />14278,55 <br />Bike Parking <br />4 Covered hike Parking structures (Deno <br />20 <br />4 <br />"Bike Haven") and 20 hoops <br />' <br />V <br />3000.00 <br />32520.00 <br />35520.00 <br />3552 <br />710.4 <br />355.2 <br />10656 <br />50793.60 <br />MeadowlardBUana <br />Vista Elementary <br />Cal Young near Queens: speed <br />Speed reader boards for school nne <br />School <br />reederboard <br />14000.00 <br />14000.00 <br />1400 <br />280 <br />140 <br />4200 <br />20020.00 <br />Queens and School Parting lot <br />Convert eAsting marked crosswalk to <br />lu sum <br />Intersecton <br />raised crossing <br />4 000.00 <br />4,000.00 <br />400 <br />80 <br />40 <br />1200 <br />5 720,00 <br />School parking lot <br />Repaint and sign parking lot, improve <br />circulation, designated no-paring, dro p <br />2 <br />10 <br />4 <br />o0 area, children-present signs. <br />g <br />E <br />$ 1,600.00 <br />$ <br />$ 2,000.00 <br />$ 1,880.00 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />E <br />5480.00 <br />546 <br />10906 <br />54.8 <br />1644 <br />$ 7836.40 <br />$292,670 <br />$29,267 <br />$5,853 <br />$2,927 <br />$87,801 <br />$418,618 <br />20% Construction Contingency $66,143 <br />Project Total $484,661 <br />Conc. <br />Concrete Ped <br />Sidevalk cost Covered Bike <br />Speed Reader C <br />ontinental - <br />Pavement Wayfinding refugelBump- <br />per SF(adjst Parking Raised <br />G <br />Stutter Flesh Bomd rassing Street Ughling <br />markings Traffic Sign Sign .Out . <br />SM. Curb for AC) ADARamp Bike Hoops Structure Crosswalk Gravel Pan <br />TYPE TOTALS <br />$ 77,505.00 $14,002.00 $ 24,030.00 $ 20,004.00 $ <br />2,814.00 $ 17,898.00 $15,930.90 $ 25,000.00 $ <br />560.00 $ 28,975.00 $ 4,305.00 $16,610.00 $ 32,524.00 $ 4,000.00 $10,180.00 <br />Mob B Erosion (11%) <br />$ 8,52555 $ 1,540.22 $ 2,643.30 $ 2,200,44 $ <br />309.54 $ 1,968.78 $ 1,752.30 $ 2,750.55 $ <br />61.60 $ 3,187.25 $ 473.55 $ 1.827.10 $ 3,577.64 $ 440.00 $ 1,119.80 <br />CONSTRUCTION SUBTOTAL <br />$ 86,03055 $15,542.22 $ 26,673.30 $ 22204.44 $ <br />3,123.54 $19,866.78 $17,682.30 $ 27155.55 $ <br />621.60 $ 32,162.25 $ 4,778.55 $18.437.10 $ 36.101.64 $ 4,440.00 $11299.80 $ <br />326.719.62 <br />Temp Protection(Traffic)2% <br />$ 1,550.10 $ 280.04 $ 480.60 $ 400.08 $ <br />5628 $ 357.96 $ 318.60 $ 500,10 $ <br />1120 $ 579.50 $ 86.10 $ 332.20 $ 650.48 $ 80.00 $ 203,60 $ <br />5,886.84 <br />Con6npenw20% <br />$ 15,501.00 $ 2,800.40 $ 4,806.00 $ 4,000.80 $ <br />562.80 $ 3,579.60 $ 3,186.00 $ 5,001.00 $ <br />112.00 $ 5.795.00 $ 861.00 $ 3,32200 $ 6,504.80 $ 800.00 $ 2,036.00 $ <br />58,868.40 <br />Ergineeing 30% <br />$ 23,251.50 $ 4,200.60 $ 7209.00 $ 6.001.20 $ <br />844.20 $ 5,369.40 $ 4,779.00 $ 7,501.50 $ <br />168.00 $ 8,692.50 $ 1291.50 $ 4,983.00 $ 9,757.20 $ 1.200.00 $ 3,054.00 $ <br />88,302.60 <br />ITEM GRAND TOTALS <br />$126,333.15 $ 22,823.26 $ 39,168.90 $ 32,606.52 $ <br />4,586.82 $ 29,173.74 $ 25,965.90 $ 40,758,15 $ <br />912,80 $ 47,229.25 $ 7,017.15 $ 27,074.30 $ 53,014.12 $ 6,520.00 $ 16,59340 $ <br />479,777.46 <br />SIGNALS <br />SIGNS <br />ROADWAY <br />STRUCTURES <br />ILLUMINATION - <br />TOTALS <br />Const Temp Prot Contingency Egineedng Totals <br />$ 86,03055 $ 1,550.10 $ 15,501.00 $ 23,251.50 $ 126,333.15 <br />$ 53,091,30 $ 956.60 $ 9,566.00 $ 14,349.00 $ 77,96290 <br />$ 83,099,04 $ 1,497.28 $ 14,972.80 $ 22,459.20 $ 122,02932 <br />$ 82,294.29 $ 1,482.78 $ 14,827.80 $ 22,24110 $ 120,84657 <br />$ 22,204.44 $ 400.08 $ 4,000.80 $ 6,001.20 $ 32,606.52 <br />$326,710.62 $ 5,886.84 $ 58,868.40 $ 88,302.60 $ 479,717.46 <br />SIGNS ARE NOT SEPARATE FROM <br />ROADWAY ON PROSPECTUS PART 1 Everything rounded a bit to match MTIP total of $555,000 <br />