New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN 004601 & 4621 -CO#1
COE
>
PW
>
POS_PWM
>
Capital
>
GJN 004601 & 4621 -CO#1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:00:45 PM
Creation date
7/19/2010 3:05:36 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
No
External_View
No
GJN
004601
GL_Project_Number
995492
GL_Grant
922
Retention_Destruction_Date
9/24/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order <br />CONTRACTOR 201nc. dabs 2G Consimr2on <br />(ADDRESS) PO Box 11735 <br />E, aene, Cretan 97440 <br />PROJECT Bond! Lane Park Mawround Ranovaton loceled at 1205 Bond Lane <br />(Job #4601) San, Stall Park Plawround Renovation located el <br />2130 Dakota Sbaal (Jab 1 <br />You are directed to make the following changes In this contract <br />Contract Contract <br />Joe a 4801 & 4621 <br />C."d# 201M0027 <br />Change order a 1 <br />Da19. 011124110 <br />CAMS Data <br />Reviewed by <br />Date' <br />Inaoedor:_ <br />Quantity <br />(Units) <br />PLA <br />S MiIOWM <br />PmI Mg, <br />A Stalran <br />Rnnebal Eng <br />M coin <br />Item <br />No. Item <br />Time <br />Chen a <br />Quantity <br />(Units) <br />Unit <br />Cost <br />Amount <br />sl- <br />Amended <br />Change <br />Net <br />Change <br />280 <br />State Street- Delete 8" PVC Stomt <br />OM9t Pipe (Job #4621) <br />0 <br />contrast <br />90.01) FT <br />$36.51 <br />$3.285.9D <br />$0.00 <br />($3,285.90) <br />1 Revised <br />0.00 <br />00 <br />$0.00 <br />Amended <br />0.00 <br />itD.00 <br />$0.00 <br />29D <br />State Sbeet - Delete 8 "Starm Draln <br />Connection (lob #4621) <br />0 <br />Original <br />1.00 LS <br />$1 <br />$1 <br />$0.00 <br />($1,3112(t) <br />Revised <br />020 <br />.01) <br />$0.00 <br />Amended <br />0.00 <br />$0.00 <br />$0.00 <br />320 <br />State Strat - Delete Resl0mt Pads <br />(Job #4621) <br />0 <br />Original <br />6.00 EACH <br />$605.00 <br />$3,630.00 <br />$0,DS <br />($3,630.00) <br />Revised <br />0.00 <br />1120 <br />$0.00 <br />Amended <br />0.00 <br />020 <br />$0.00 <br />3BO <br />Stale Strret - Delete Fence (Job 94621) <br />' <br />0 <br />0601nal <br />162.00 LF <br />$40.01 <br />$6,481.62 <br />$am <br />($6,481.62) <br />Reined <br />D.ro <br />$0.00 <br />oDo <br />Amended <br />0.00 <br />.00 <br />.W <br />410 <br />Starts Street - Delete Stepping Slane <br />Prime (Job #4621) <br />0 <br />Original <br />120 IS <br />$811.00 <br />$811.00 <br />1 $0.00 <br />($81120) <br />Revised <br />0.00 <br />0.00 <br />000 <br />Amended <br />D.00 <br />0.00 <br />$0.01 <br />420 <br />State Street - castle Shrubs, I8.2C <br />(3ob #4621) <br />0 <br />Orl Inal <br />11.00 EACH <br />32.10 <br />353.10 <br />$020 <br />($353.1% <br />Revised <br />0.00 <br />.Do <br />.00 <br />Amended <br />0.00 <br />.00 <br />$0.00 <br />430 <br />State Stress- Delete Shrubs, 2 tenon <br />(Job #4621) <br />0 <br />Original <br />3620 EACH <br />1.40 <br />MAD <br />0.00 <br />($710.40) <br />Reused <br />0.00 <br />.00 <br />0.D0 <br />Amended <br />0.00 <br />0.00 <br />0.00 <br />The original contract work days are 00 data <br />The contract time change this C.0 00 da <br />The contract time change by previous C.O.'s 0.0 dare <br />The new contract work days are 00 days <br />The onginal contract sum was <br />Net change by previous change order <br />----- -- <br />Net change due to amendment by previous change order _ _ <br />The contract sum prior to this change order was <br />This change order will change contrail sum by this amount <br />The new contract net change sum <br />The new contract amendment sum <br />The new contrail gum Including this change order will be <br />Percents a a$ on Intl comlact <br />NE7 CNAXGE 'I TO AMENDMENTS <br />Approval by <br />City Engineer / Prime Contractor <br />-7 P <br />Dale Dale <br />❑ CONTRACTOR ❑ OFFICE FILE ❑ PURCHASINGICRC <br />11119.640 40 <br />$O.Do <br />$0.00 <br />$119.640.40 <br />nlisua.021 <br />(616.643 021 <br />$000 <br />$102.997.38 <br />13.91% <br />0.00% <br />Third Party <br />Date <br />0.IPROJECTSIPROJ- 1W6011ConM1 .n \Change 0,d*r%M601&4S21ChSrds0der1.Aa <br />This changes the bid Items as follows. <br />
The URL can be used to link to this page
Your browser does not support the video tag.