Run Date: <br />06/30/2010 10:28:01 <br />Page 2 <br />City of Eugene <br />Contract <br />Preliminary Progress <br />Payment <br />Payment No : 001 <br />Contractor: KNIFE RIVER <br />Original Contr <br />act: <br />$775,077.50 <br />Job 93-004586 <br />Current Amount: <br />$775,077.50 <br />Contract <br />No: 2010-00024 <br />Contract Award D <br />ate: 05/28/2 <br />010 <br />PO 2010100323 <br />Completion D <br />ate: 07/30/2 <br />010 <br />Assessable: No <br />Current Contract <br />Estimated Payment <br />Cumulative Totals <br />Complete <br />Line <br />Description Last Chng Or <br />Unit Price <br />Unit Measure <br />Quantity <br />Amount <br />Quantity <br />Amount <br />Quantity <br />Amount <br />PPP HARLOW RD FROM I-5 TO COBURG ROAD <br />General <br />0000 <br />Liquidated Damages <br />($400.00) <br />DAY <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0010 <br />MOBILIZATION <br />$51,387.50 <br />LUMPSUM <br />1.000 <br />$51,387.50 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0020 <br />TEMP. WORK ZONE TRAFFIC CONTRO <br />$25,000.00 <br />LUMPSUM <br />1.000 <br />$25,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0030 <br />TEMPORARY STRIPING <br />$3,800.00 <br />LUMPSUM <br />1.000 <br />$3,800.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0040 <br />PORTABLE CHANGEABLE MESSAGE SI <br />$50.00 <br />DAY <br />140.000 <br />$7,000.00 <br />3.000 <br />$150.00 <br />3.000 <br />$150.00 <br />2.00 <br />0050 <br />FLAGGERS <br />$44.00 <br />HOUR <br />1,250.000 <br />$55,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0060 <br />CITY PROVIDED SPEC INFO SIGNS <br />$325.00 <br />EACH <br />4.000 <br />$1,300.00 <br />2.000 <br />$650.00 <br />2.000 <br />$650.00 <br />50.00 <br />0070 <br />EROSION CONTROL <br />$3,500.00 <br />LUMPSUM <br />1.000 <br />$3,500.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0080 <br />TREE PROTECTION FENCING <br />$4.00 <br />FOOT <br />26.000 <br />$104.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0090 <br />VACUUM EXCAVATION (ROOT ZONE) <br />$175.00 <br />HOUR <br />3.000 <br />$525.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0100 <br />GENERAL EXCAVATION <br />$18.00 <br />CUYD <br />590.000 <br />$10,620.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0110 <br />10 INCH PVC PIPE <br />$70.00 <br />FOOT <br />91.000 <br />$6,370.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0120 <br />12 INCH PVC PIPE <br />$100.00 <br />FOOT <br />6.000 <br />$600.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0130 <br />18 INCH PVC PIPE <br />$100.00 <br />FOOT <br />12.000 <br />$1,200.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0140 <br />18 INCH MECHANICAL PLUG <br />$230.00 <br />EACH <br />1.000 <br />$230.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0150 <br />CONCRETE CURB AND GUTTER <br />$44.00 <br />FOOT <br />32.000 <br />$1,408.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0160 <br />CONCRETE WALK, 4" THICK <br />$19.00 <br />SQFT <br />121.000 <br />$2,299.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0170 <br />TRUNCATED DOME DETECTABLE WARN <br />$21.00 <br />SQFT <br />18.000 <br />$378.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0180 <br />ADJUSTING BOXES <br />$300.00 <br />EACH <br />11.000 <br />$3,300.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0190 <br />ADJUSTING CATCH BASINS <br />$400.00 <br />EACH <br />1.000 <br />$400.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0200 <br />MINOR ADJUSTMENT OF MANHOLES <br />$1,000.00 <br />EACH <br />39.000 <br />$39,000.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0210 <br />REM/REPL FRAME/COVER-ST <br />$300.00 <br />EACH <br />16.000 <br />$4,800.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />