AMENDMENT NO. ONE TO <br />City of Eugene Contract No. 2010 - 05326 <br />This Amendment is made to the Trade Services Contract dated April 27, 2010, between the City <br />of Eugene (City) and Jackson Fence and Construction (Contractor). <br />City and Contractor mutually agree to amend the contract referenced above as follows: <br />The wire fabric for this project shall be changed from woven wire cattle fencing to non- <br />climb horse fencing. Non-climb horse fencing offers a narrow mesh pattern to prevent <br />animals from stepping through the wire material. This change in material requires the <br />use of shorter length wire rolls, additional bracing, and increases the required labor. <br />These changes increase the contract by $4, 100. <br />All other terms and conditions of this contract remain in full force and effect. <br />CITY OF EUGENE <br />i <br />ohnny dlin ` <br />Parks and Open Space Director <br />CONTRACTOR <br />Ken Japl on <br />Owner <br />Date: I!; /0 -/0 <br />Date: S-01-ito <br />Contract Amendment <br />(Revised November 1994) <br />