New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4625 Wildish Pmt#3
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4625 Wildish Pmt#3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:29:15 PM
Creation date
6/18/2010 8:48:32 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004625
GL_Project_Number
995884
Identification_Number
2010100237
COE_Contract_Number
2010-00016
Retention_Destruction_Date
6/1/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br />1.0 DESCRIPTION OF WORK <br />Contractor shall prepare management plans for up to five sites within the Willamette Valley. TNC will prioritize amongst sites <br />and communicate order and timing with Contractor. Management plans will follow TNC outline as provided below. Contractor <br />will not be responsible for production'of any Figures or Appendices but will incorporate both as they are available into the <br />management plans. <br />2.0 ACCESSWCATION <br />When accessing privately-owned sites permission will be granted by the landowner. TNC will obtain permission to access all <br />property under private ownership. TNC will supply site location aerial photographs, phone contacts where necessary, gate keys, <br />and any other information to assure access to all sites. Sites are located on varied terrain from steep to gentle slopes with various <br />distances from roads. <br />3.0 TIMELINE and DELIVERABLES: <br />TNC will prioritize order and timing of all management plans. Contractor will develop draft management plans no later than <br />December 31, 2010. TNC will review draft and provide comments no later than January 31, 2011. Contractor will provide final <br />management plans by March 31. 2011. <br />Management Plan Outline: <br />Table of Contents <br />List of Figures <br />List of Tables <br />List of Appendices <br />Executive Summary <br />1 Intrnriurtinn <br />
The URL can be used to link to this page
Your browser does not support the video tag.