Run Date: 06/15/2010 07:41:14 <br />Estimate: Post Bid Estimate <br />Job 93-004584 PPP W 18TH FROM 510' E. OF CHAMBERS TO <br />Line No. Description <br />PPP W 18TH FROM 510' E. OF CHAMBERS TO CITY VIEW <br />General <br />City of Eugene <br />Estimate Distribution <br />CITY VIEW <br />Quantity Unit Unit Price <br />mount <br />0010. <br />MOBILIZATION <br />1.00 <br />LUMPSUM <br />$31,432.95 <br />$31,432.95 <br />0020. <br />TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE <br />1.00 <br />LUMPSUM <br />$18,500.00 <br />$18,500.00 <br />0030. <br />PORTABLE CHANGEABLE MESSAGE SIGNS <br />160.00 <br />DAY <br />$55.00 <br />$8,800.00 <br />0040. <br />SEQUENTIAL ARROW SIGNS <br />48.00 <br />DAY <br />$25.00 <br />$1,200.00 <br />0050. <br />CITY PROVIDED SPECIAL INFO SIGNS <br />4.00 <br />EACH <br />$320.00 <br />$1,280.00 <br />0060. <br />SPECIAL SIGNS <br />99.00 <br />SQFT <br />$25.00 <br />$2,475.00 <br />0070. <br />EROSION CONTROL <br />1.00 <br />LUMPSUM <br />$4,000.00 <br />$4,000.00 <br />0080. <br />TEMPORARY STRIPING <br />1.00 <br />LUMPSUM <br />$3,500.00 <br />$3,500.00 <br />0090. <br />FLAGGERS <br />1,250.00 <br />HOUR <br />$42.00 <br />$52,500.00 <br />0100. <br />GENERAL EXCAVATION <br />3,893.00 <br />CUYD <br />$13.00 <br />$50,609.00 <br />0110. <br />CATCH BASIN TRAP <br />8.00 <br />EACH <br />$350.00 <br />$2,800.00 <br />0120. <br />REMOVAL OF CATCH BASINS <br />8.00 <br />EACH <br />$520.00 <br />$4,160.00 <br />0130. <br />REMOVAL OF PIPES <br />267.00 <br />FOOT <br />$18.00 <br />$4,806.00 <br />0140. <br />GRIND GUTTER <br />3.00 <br />HOUR <br />$425.00 <br />$1,275.00 <br />0150. <br />10 INCH PVC PIPE <br />167.00 <br />FOOT <br />$59.00 <br />$9,853.00 <br />0160. <br />12 INCH PVC PIPE <br />58.00 <br />FOOT <br />$55.00 <br />$3,190.00 <br />0170. <br />15 INCH PVC PIPE <br />165.00 <br />FOOT <br />$58.00 <br />$9,570.00 <br />0180. <br />18 INCH PVC PIPE <br />20.00 <br />FOOT <br />$100.00 <br />$2,000.00 <br />0190. <br />10 INCH C900 PIPE <br />125.00 <br />FOOT <br />$55.00 <br />$6,875.00 <br />0200. <br />18 INCH C900 PIPE <br />12.00 <br />FOOT <br />$175.00 <br />$2,100.00 <br />0210. <br />PIPE TEES, 15"x15"x10" <br />3.00 <br />EACH <br />$300.00 <br />$900.00 <br />0220. <br />PIPE TEES, 18"x18"x10" <br />4.00 <br />EACH <br />$625.00 <br />$2,500.00 <br />0230. <br />PIPE WYES, 15"x15"x10" <br />1.00 <br />EACH <br />$350.00 <br />$350.00 <br />0240. <br />CATCH BASINS WITH BIKE PROOF GRATE <br />8.00 <br />EACH <br />$1,300.00 <br />$10,400.00 <br />0250. <br />WHEEL CHAIR PROOF GRATE INSTALLED COMPLETE <br />1.00 <br />EACH <br />$300.00 <br />$300.00 <br />0260. <br />ADJUSTING CATCH BASINS <br />3.00 <br />EACH <br />$500.00 <br />$1,500.00 <br />0270. <br />REPAIR PIPE GROUT EXISTING PIPE <br />1.00 <br />EACH <br />$470.00 <br />$470.00 <br />0280. <br />MINOR ADJUSTMENT OF MANHOLES <br />17.00 <br />EACH <br />$1,300.00 <br />$22,100.00 <br />0290. <br />MAJOR ADJUSTMENT OF MANHOLES <br />8.00 <br />EACH <br />$2,000.00 <br />$16,000.00 <br />0300. <br />REM / REP FRAME / COVER - ST <br />8.00 <br />EACH <br />$325.00 <br />$2,600.00 <br />0310. <br />REM / REP FRAME / COVER - WW <br />7.00 <br />EACH <br />$325.00 <br />$2,275.00 <br />0320. <br />CONTROLLED LOW STRENGHT MATERIALS (CLSM) <br />4.00 <br />CUYD <br />$85.00 <br />$340.00 <br />0330. <br />ADJUSTING BOXES <br />16.00 <br />EACH <br />$275.00 <br />$4,400.00 <br />0340. <br />ADJUSTING WW CLEANOUT <br />1.00 <br />EACH <br />$240.00 <br />$240.00 <br />0350. <br />COLD PLANE PVMT REMOVAL, 2" DEEP <br />2,965.00 <br />SQFT <br />$1.00 <br />$2,965.00 <br />0360. <br />COLD PLANE PVMT REMOVAL, 3.5" TO 5" DEEP <br />41,724.00 <br />SQFT <br />$0.48 <br />$20,027.52 <br />0370. <br />12" CEMENT TREATED BASE (CTB) <br />1,850.00 <br />SQYD <br />$20.25 <br />$37,462.50 <br />0380. <br />12" IN-PLACE CEMENT TREATED BASE (ICTB) <br />10,096.00 <br />SQYD <br />$1.50 <br />$15,144.00 <br />0390. <br />PORTLAND CEMENT <br />440.00 <br />TON <br />$108.00 <br />$47,520.00 <br />0400. <br />LEVEL 3, DENSE, 1/2" WMAC <br />3,628.00 <br />TON <br />$52.00 <br />$188,656.00 <br />0410. <br />LEVEL 1, DENSE, 1/2" WMAC <br />1,748.00 <br />TON <br />$54.00 <br />$94,392.00 <br />0420. <br />PLAIN CONCRETE PVMT, DOWELLED, 10 IN. THICK <br />1,061.00 <br />SQYD <br />$69.50 <br />$73,739.50 <br />0430. <br />TRUNCATED DOME DETECTABLE WARNING SURFACE <br />158.00 <br />SQFT <br />$18.50 <br />$2,923.00 <br />0440. <br />CONCRETE WALKS, 4" THICK <br />2,995.00 <br />SQFT <br />$10.50 <br />$31,447.50 <br />0450. <br />CONCRETE CURB AND GUTTER <br />374.00 <br />FOOT <br />$45.00 <br />$16,830.00 <br />0460. <br />5' WIDE CONCRETE CURB AND GUTTER <br />10.00 <br />FOOT <br />$130.00 <br />$1,300.00 <br />0470. <br />STANDARD CONCRETE CURBS <br />273.00 <br />EACH <br />$12.00 <br />$3,276.00 <br />0480. <br />PVMT LEGEND, TYPE B: ARROWS <br />13.00 <br />EACH <br />$251.00 <br />$3,263.00 <br />0490. <br />PVMT LEGEND, TYPE B: BICYCLE LANE SYMBOLS <br />15.00 <br />EACH <br />$256.00 <br />$3,840.00 <br />0500. <br />PVMT LINE, TYPE B <br />1,156.00 <br />SQFT <br />$8.00 <br />$9,248.00 <br />0510. <br />BI-DIRECTIONAL YELLOW TYPE I MARKERS <br />161.00 <br />EACH <br />$5.00 <br />$805.00 <br />0520. <br />MONO-DIRECTIONAL CRYSTAL TYPE I MARKERS <br />44.00 <br />EACH <br />$5.00 <br />$220.00 <br />0530. <br />THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED <br />1.00 <br />LUMPSUM <br />$10,600.00 <br />$10,600.00 <br />0540. <br />REMOVE AND REINSTALL EXISTING SIGNS <br />1.00 <br />LUMPSUM <br />$250.00 <br />$250.00 <br />0550. <br />LOOP DETECTORS INSTALLATION <br />54.00 <br />EACH <br />$480.00 <br />$25,920.00 <br />0560. <br />CONDUIT UNDER HARD SURFACING <br />1,405.00 <br />FOOT <br />$37.00 <br />$51,985.00 <br />61151-120) 0 <br />L-f <br />