CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order <br />CONTRACTOR: Kipco Inc <br />(ADDRESS) 90465 Woodruff St. <br />Eugene, OR <br />97402 <br />PROJECT 2010 Stormwater Rehabilitation <br />You are directed to make the following changes in this contract: <br />Contract <br />Contract <br />Contract <br />Job # 4671 <br />Contract# 2010-23 <br />ChangeOrder# 1 <br />Date: 05/13/10 <br />CAMS Date: <br />Reviewed by: Date: <br />Inspector. KM r <br />DK <br />Proj. Mgr. TC <br />Principal Eng. PK <br />Item <br />No. Item <br />Time <br />Change <br />Quantity <br />(Units) <br />Unit <br />Cost <br />Amount <br /> <br />Amended <br />Change <br />Net <br />Change <br />Ori inal <br />3.00 <br />$2,050.00 <br />6150.00 <br />($2;050.00) <br />180 <br />Concrete Manhole, 24" - Flat Top <br />Revised <br />2.00 <br />$2,050.00 <br />4100.00 <br />Amended <br />0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Original <br />0.00 <br />0.00 <br />0.00 <br />$0.00 <br />181 <br />Concrete Manhole - Flat Top <br />Revised <br />0.00 <br />0.00 <br />0.00 <br />Amended <br />1.00 <br />$2,680.00 <br />$2,680.00 <br />$2,680.00 <br />Original <br />0.00 <br />0.00 <br />0.00 <br />$0.00 <br />Revised <br />0.00 <br />0.00 <br />0.00 <br />Amended <br />0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Original <br />0.00 <br />0.00 <br />0.00 <br />$0.00 <br />Revised <br />0.00 <br />0.00 <br />0.00 <br />Amended <br />0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Original <br />0.00 <br />0.00 <br />.00 <br />$0.00 <br />Revised <br />0.00 <br />0.00 <br />0.00 <br />Amended <br />0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Original <br />0.00 <br />0.00 <br />0.00 <br />$0.00 <br />Revised <br />0.00 <br />0.00 <br />0.00 <br />Amended <br />0.00 <br />$0.00 11 <br />0.00 <br />$0.00 <br />The original contract work days are 0.0 days <br />The contract time change this C.0 0.0 days <br />The contract time change by previous C.O.'s 0.0 days <br />The new contract work days are 0.0 days <br />The original contract sum was <br />Net change by previous change order <br /> <br />Net change due to amendment by previous change order <br />The contract sum prior tolthis change order was <br /> <br />This change order will change contract sum by this amount <br />_ <br />The new contract net change sum _ » <br />The new contract amendment sum <br /> <br />_ <br />The new contract sum including this change order will be <br />Percentage of original contract <br /> <br />NET CHANGE DUE TO AMENDMENTS <br />Approval b <br />City Engineer <br />G6Ila <br />Date <br />❑ CONTRACTOR ❑ OFFICE FILE <br />4",4- l4-.~j",-- <br />Prime Contractor <br />5--1:;-10 <br />Date <br />❑ PURCHASING/CRO <br />$120,195.00 <br />$0.00 <br />$0.00 <br />$120,195.00 <br />$630.00 <br />($2,050.00) <br />$2,680.00 <br />$120,825.00 <br />0.52% <br />2.23% <br />Third Party <br />Date <br />\\oesrv811\ENGINEER\PROJECTS\PROJ-1\4671 Stormwater Rehab Various Locations\Construction\Change Orders\467120100513 Change Order-1.xis <br />This changes the bid items as follows: <br />