05/14/2010 13:49 FAX 541 682 8410 CITY EUGENE PW ENG WILDISH CONST IA002/010,au <br />Public Works <br />Engineering <br />City of Eugene <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />(541) 682-5560 <br />(541) 682-8410 FAX <br />ADDENDUM NO.1 <br />TO" THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />PAVEMENT BOND MEASURE <br />PATTERSON STREET REHABILITATION <br />PATTERSON ST FROM 13TH AVE TO 24`" AVE <br />E 18TH AVE FROM PATTERSON ST TO HILYARD ST <br />E 23RD AVE FROM PATTERSON ST TO HILYARD ST <br />May 14, 2010 JOB #4622 BID NUMBER 14 <br />TO ALL PLANHOLDERS: <br />The following changes shall amend and supplement the project bidding documents only to the extent <br />specifically shown and noted. All other conditions shall remain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this <br />addendum and the total of these bid items then add in the appropriate place on the bid form. <br />CHANGES TO CALL FOR BIDS AND PROPOSAL: <br />Bid Schedule <br />(Delete) Bid Schedule dated 5/6/2010. <br />(Add) Revised Bid Schedule dated 5/14/2010 <br />CHANGES TO SPECIAL PROVISIONS: <br />00180.50(h) Contract Time <br />(Add) Street closures are not allowed until June 21, 2010. <br />00759.12 Sidewalk Ramp Treatment <br />(Delete) Armor Cast Detectable Warning Panels from the approved products list. <br />(Add) To the end of the first paragraph (the ,underlined text), "or approved portland cement <br />concrete or cast iron equal." <br />(Delete) The last paragraph that begins "Plastic materials for truncated domes..." <br />Addendum #I - Job #4622 <br />