New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4622 Wildish 2010-00026
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4622 Wildish 2010-00026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:26:55 PM
Creation date
6/16/2010 4:19:49 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004622
GL_Project_Number
995874
COE_Contract_Number
2010-00026
Retention_Destruction_Date
9/10/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/18/2010 11:34 FAX 541 682 8410 CITY EUGENE PW ENG WILDISH CONST 1&02/00po <br />U Public Works <br />W#-Engineering <br />City of Eugene <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />(541) 682-5560 <br />(541) 682-84.10 FAX <br />ADDENDUM NO.2 <br />TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />PAVEMENT BOND MEASURE <br />PATTERSON STREET REHABILITATION <br />PATTERSON ST FROM 13"8 AVE TO 24x` AVE <br />E 18' AVE FROM PATTERSON ST TO HILYARD ST <br />E 23"D AVE FROM PATTERSON ST TO HILYARD ST <br />May 18, 2010 JOB #4622 BID NUMBER 14 <br />TO ALL PLANHOLDERS: <br />The following changes shall amend and supplement the project bidding documents only to the extent <br />specifically shown and noted. All other conditions shall remain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this <br />addendum and the total of these bid items then add in the appropriate place on the bid form. <br />CHANGES TO SPECIAL PROVISIONS: <br />00330.41(x)(6) Excavation of Existing Surfaces <br />(Add) During the general excavation Work, each day the Contractor shall excavate the <br />existing roadway material and immediately place subgrade geotextile and aggregate <br />base to the specific thickness and completely cover the excavated area. Do not excavate <br />more roadway than can be base rocked daily. Construction equipment shall not be on <br />the subgrade until the excavation is base rocked to the full base rock thickness. The <br />excavation shall be done with hoe equipment equipped with a smooth edged bucket to <br />minimize disturbance to the subgrade. <br />After completing the excavation to the designated depth, notify Engineer for inspection <br />and approval of the subgrade before geotextile and base rock are placed. The Engineer <br />may direct extra depth excavation as needed to remove and backfill unstable areas. <br />Do not compact the subgrade. <br />00641.43(a) Aggregate Base Courses <br />(Delete) The first paragraph that begins, "If the required compacted depth of the base course <br />exceeds 6 inches.... <br />Addendum #2 - Job #4622 <br />
The URL can be used to link to this page
Your browser does not support the video tag.