New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4279 EWEB Inv Date 6/4/10
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4279 EWEB Inv Date 6/4/10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2014 1:01:27 PM
Creation date
6/14/2010 11:56:07 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
GJN
004279
GL_Project_Number
975404
Identification_Number
2010014422
COE_Contract_Number
2010-00259
Retention_Destruction_Date
5/8/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EUGENE WATER & ELECTRIC BOARD <br />ELECTRIC UNDERGROUND EXTENSION AGREEMENT <br />Date of Application June 4, 2010 <br />City of Eugene (Mark Schoening), hereinafter called the customer, requests the Eugene Water & Electric Board, hereinafter called EWES. to <br />extend its electric system to serve <br />Project Name & Location West Bank Path lighting <br />Division Avenue & River Avenue & Beltline <br />Customer agrees the electric distribution extension will be provided in accordance with the requirements and obligations of this Agreement <br />and the attached Exhibits Utility service is also subject to EWEB's applicable policies. regulations and rates now in existence or hereafter adopted. <br />and the attached drawing #B-25923 Customer has received and read copies of EWEB's existing written policies and standards <br />Customer will execute all easements required by EWES at no cost to EWES When practical, the customer will include such easements in <br />the recorded plat of the above-mentioned development Customer will further record deed restrictions requiring underground service to all <br />properties to be served by the underground distribution system being installed Customer agrees that all easements shall provide that no buildings <br />or structures may be constructed on such easements <br />Customer is aware of the right, as provided in ORS 92 097. to employ a licensed engineer to design or supervise the installation of the <br />improvements provided for in this Agreement. but declines to do so <br />Unless otherwise specified in this Agreement. the customer agrees to pay for the following extension charges prior to EWEB's <br />commencement of work <br />Contribution in aid of construction = $5,37900 <br />Other = <br />All charges above are subject to change if this Agreement is not signed and returned within thirty (30) days of the application date above <br />and if the extension facilities are not installed with permanent service connections within six (6) months of the date of application <br />This Agreement authorizes EWEB to proceed with the necessary steps to provide electrical underground services as shown on the <br />attached drawing, however. it is understood that until the conditions of this Agreement are complied with, EWES will not install the extension <br />facilities <br />Customer agrees to inform all subsequent owners of the requirements and obligations of underground service in accordance with the <br />Board's policies and procedures This Agreement shall bind and benefit the heirs, personal representatives, successors or assigns of the respective <br />parties <br />® EWEB-CONSTRUCTED SUBSTRUCTURES <br />Customer will be responsible for providing. within six Inches (5") of final grade, compacted level ground of adequate <br />width for EWES to Install the utility systems Customer will provide finished grade stakes and property corners so EWES can <br />install the utility system at proper depth and location Customer will monitor EWEB's Installation to assure the installation is <br />according to stakes that have been provided <br />❑ CUSTOMER-INSTALLED SUBSTRUCTURES <br />Customer will own and maintain all customer-Installed ducts and vaults. Including service ducts in accordance with <br />EWEB's service policies EWES will own and maintain all other underground system facilities It is understood that the <br />customer will construct and furnish service lateral, Including duct, trench and backfill in accordance with EWES policy <br />Customer assumes all liability and agrees to Indemnify EWES for all damages to EWES facilities caused by the <br />customer or customer's agents <br />EWEB shall assume ownership and responsibility for maintenance and repair of the service lateral conductors and <br />conduit at time of electrical connection (See Board Policy, Electric Service Section IID(5) ) <br />❑ DEVELOPER-INSTALLED SUBSTRUCTURES <br />EWEB shall allow Developer to construct substructure facilities required to serve a development <br />Electric substructure installed in accord with Construction By Developer (CBD) policy must comply with the CBD <br />Handbook, approved drawings, standards and material specifications All work will be inspected, and Installations that do not <br />comply will not be energized Once accepted, electric substructure installed by the CBD policy becomes the property of <br />EWES Developers are required to provide payment and performance bonds, and to warrant the work for one year after <br />acceptance <br />Date Customer Signed (040kO <br />City of Eugene (Mark Schoening) <br />J, Business name or Customer Name (Printed) <br />Autho zed Signature <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />Mailing Address <br />EUGENE WATER & ELECTRIC BOARD <br />By <br />Electric Distribution Supervisor <br />Date <br />Date Connected <br />Phone <br />( 1 <br />Cellular Phone <br />Company TIN# <br />Customer Social Security Number (optional) <br />Job # 33529 Job Chief Marcus Lynch <br />Revised 6/1/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.