00990.90 General <br />(ADD) Pay Item Unit of Measurement <br />(n) Loop Feeder Cable ................................Foot <br />(ADD) Item (n) includes payment for all Work to furnish and install loop feeder cable, as identified in <br />the plans or directed by the Engineer, in new or existing conduit and junction boxes, including <br />splices, connections to the controller, and tie wraps for placement on aerial messenger cables. <br />Removal and salvage of existing loop feeder wire as identified in the plans is incidental. <br />CHANGES TO PLAN SHEETS: <br />(REPLACE) Plan sheet #4435 C-2 included in the Job #4637 original plan sheets, with 4637 C-2A and <br />4637 C-2B <br />If you have questions about this addendum or the project, please call John Bonham at (541) 682-5300. <br />All bidders shall acknowledge the receipt of and acceptance of this Addendum No. 1 by signing and submitting <br />the signed Addendum with the bid. Bids submitted without this Addendum, or with the Addendum not signed, <br />will be considered informal. <br />4cMkhoening, P. . <br />City Engineer <br />Receipt acknowledged and conditions agreed <br />this X day of r , 2010. q <br />Bidder: <br />By: <br />Addendum #1- Job #4637 & 4435 Page 2 <br />