Page 3 <br />gun Date: 04/1612010 09:40:15 <br />Revised Sid Schedule <br />Amount <br />Sob No- 93-004435 93-004637 Unit Price <br />Bid No. 2010-000008 Quantit Unit <br />Line Descri tion <br />8 IS RD Listed in Bold ~-(Yj <br />93-004435 PPP ough Addendum NO. 0002 1.000 LUMPSUM $ <br />Inclusive thrrong } ~ <br />General j $ / <br />50. MOBILIZATION 1 <br />03 <br />1.000 LUMPSUM <br />ONE TRAFFIC CONTROL, COMPLETE <br />0360. <br />TEMP. WORK Z <br />1.000 LUMPSUM <br />EROSION CONTROL <br />0370. <br />1.000 LUMPSUM <br />TEMPORARY STRIPING <br />0380. <br />50.000 DAY <br />SEQUENTIAL ARROW SIGNS <br />0390. <br />50.000 DAY <br />PORTABLE CHANGEABLE MESSAGE SIGNS <br />0400 <br />300.000 HOUR <br />0410. <br />FLAGGERS <br />4.000 EACH <br />CITY PROVIDED INFORMATION SIGNS <br />0420. <br />3.000 EACH <br />ADJUSTING BOXES <br />0430. <br />9.000 EACH <br />MSNOR AUJUSTWM OF MANHOLES <br />0440. <br />3.000 EACH <br />MS FRAME/COVER WW <br />0450. <br />6.000 EACH <br />BRAtdE/COVER ST <br />0460. <br />73,390.000 ,SOFT <br />COLD PLANE PVMT REMOVAL, 0-4 INCHES DEEP <br />0470 <br />102,658.000 sQFT <br />Fmc PAVEMENT REMOVAL <br />0480. <br />6,800.000 TON <br />1/2 INCH, DENSE, WMp'C <br />VEL 3 <br />- <br />COMPLETE <br />0490. <br />, <br />LE <br />C PER TON OF <br />ASPHALT CEMENT IN WMA <br />_ <br />WMAC <br />293.000 SOFT <br />CONCRETE WALKS <br />0500. <br />16.000 SQFT <br />TRUNCATED DOME TEXTURING <br />0510. <br />