04/29/2010 15:41 FAX 541 682 8410 CITY EUGENE PW ENG 4 MORSE BROS 191002/003 <br />AM& <br />Public Works <br />Engineering <br />City of Eugene <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />(541) 682-5560 <br />(541) 682-8410 FAX <br />ADDENDUM NO. 1 <br />TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />PAVEMENT BOND MEASURE ON HARLOW ROAD FROM I-5 TO COBURG ROAD <br />APRIL 29, 2010 JOB #4586 BID NUMBER 9 <br />TO ALL PLANHOLDERS: <br />The following changes shall amend and supplement the project bidding documents only to the extent <br />specifically shown and noted. All other conditions shall remain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this <br />addendum and the total of these bid items then add in the appropriate place on the bid form. <br />CHANGES TO SPECIAL PROVISIONS: <br />(ADD) 00220.02 Public Safety and Mobility <br />The driveway access on the north side of Harlow Road from Station 45+50 to 46+00 <br />(the school driveway) and Calvin Street shall not be closed at the same time. One of <br />these access points to the school shall be open at all times. <br />(ADD) 00620.10 Existing Materials <br />The following information is made available for reference and information only. This <br />information was gathered on August 2009 Paving Report (C Cores) and March 2010 <br />(H Cores). <br />Addendum #1- Job #4586 Page 1 <br />