New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4586 Knife River 2010-00024
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4586 Knife River 2010-00024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:35:47 AM
Creation date
6/10/2010 11:21:46 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004586
GL_Project_Number
995384
COE_Contract_Number
2010-00024
Retention_Destruction_Date
8/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUBLIC IMPROVEMENT CONTRACT FOR USE WITH <br />OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION <br />BETWEEN: The City of Eugene, an Oregon <br />Municipal Corporation (City) <br />AND: Knife River Corporation-Northwest (Contractor) <br />CONTRACT NO.: 2010-00024 <br />JOB NO.: 4586 <br />PROJECT: PAVEMENT BOND MEASURE ON HARLOW-ROAD-FROM 1-5 -T-O------- <br />COBURG-ROAD _ <br />RECITALS <br />Contractor was the successful bidder for the contract construction of the public <br />improvement project described in the plans and specifications for the project that were included in <br />the bid documents and the Oregon Standard Specifications for Construction which form a part of <br />the Contract. <br />AGREEMENT <br />The Contract. The Contract between the City and Contractor (the "Contract") includes this <br />Document and its exhibits, together with all of the documents and materials included in the <br />definition of the "Contract" under the 2008 Oregon Standard Specifications for Construction, <br />Volumes I and II, issued by the Oregon Department of Transportation, as modified by the <br />City's Amendments to the Specifications for Volume I (the "General Conditions"), and Volume <br />II Supplemental Specifications for the Project and any other Special Provisions included in <br />the Bid Documents (all specifications, plans, drawings and Special Provisions included in the <br />Contract are collectively referred to herein as the "Specifications"). In addition, the Contract <br />between the City and Contractor shall be deemed to incorporate all reports, records, laws, <br />rules and orders referenced in the Contract documents. <br />This Document includes and incorporates the following Exhibits: <br />Exhibit A - Solicitation Documents <br />2. Definitions. Unless otherwise specifically defined in this Document, all capitalized terms <br />which are not proper nouns shall have the meanings assigned thereto in the Specifications. <br />3. Project. The project is generally described as. <br />PAVEMENT BOND MEASURE ON HARLOW ROAD FROM 1-5 TO COBURG ROAD <br />4. Work to be Performed. Contractor agrees to furnish, as the "Work," all services, labor, <br />materials and equipment which are described as Contractor's responsibility in the <br />Specifications, as the same may be modified in accordance with the Contract, and to <br />construct the improvement described therein (the "Project"), all according to the provisions of <br />the Contract. All parts of the Work are the sole responsibility of Contractor. <br />Public Improvement Contract for Use with Oregon Standard Specifications - Page 1 ORIGINAL <br />(Revised October 2008) <br />
The URL can be used to link to this page
Your browser does not support the video tag.