Lane County <br />Report ID LBILL001 BILLABLE PROJECT COSTS Page No 1 <br />Run Date 05/26/2010 O <br />Run Time 14 59 14 C= <br />N <br />8dleble Pro at Coss for Focal Prnod 2010-M Period begins 04/01/2010 and nuts mcludmg 61f30/2010 t'p <br />Project: 36644109 Delta Ponds Path j4378) Overhead Rates Applied for this priij c Operational (Where applicable) <br />Q <br />Billed By 3636213 Materials Testm£ Not 36644109 `a <br />P4090-PCC quality control <br />TranDate TrenlD Resource Employed Qty Amount Overhead Transaction Remark <br />X04/01/2010 LABOR Engineering Associate 25 $6673 $8222 QUALITY ASSURANCE TESTING FOR DECK POUR (PCC) <br />~ v P4090 Touts S 66 73 $ 82 22 S 148 95 <br />3636213 Materials Test n Total 148.95 <br />36644109 Proiect Grand Total 1 148.95 <br />