Lane County <br />Report ID LBILL001 BILLABLE PROJECT COSTS Page No I <br />Run Dam 05/262010 <br />Run Time 145641 <br />Billable Project Costs for Fiscal Period 2010-04 Period begins 04/012010 and ends msluding 04/30/2010 <br />Project: 36644019 Sylvan/Floral Hill FDR (4673) Overhead Rates Applied for this project- Operational (Where applicable) <br />Billed By 3636213 Materials Testlne Prol 36644019 <br />P4135-Mix design <br />TranDate <br />TnnID <br />Resource Employed <br />Qty Amount <br />Ovediesd <br />Transaction Remark <br />03/22/2010 <br />LABOR <br />Sr hngmeermg Associate <br />1 $28 12 <br />$3465 <br />CrB DESIGN <br />04101/1010 <br />LABOR <br />Sr Engineering Associate <br />1 $28 12 <br />$3465 <br />CfB DESIGN <br />04/082010 <br />LABOR <br />Sr Engineering Associate <br />1 $28 12 <br />S3465 <br />C I3 DESIGN <br />04/142010 <br />LABOR <br />Sr Engineering Associate <br />1 $2812 <br />53465 <br />DESIGN REPORT <br />04/152010 <br />LABOR <br />Sr Engineering Miccure <br />1 $2812 <br />$3465 <br />DESIGN REPORT <br />P4135 Totals <br />S 14060 <br />$ 173.25 <br />S 31385 <br />0 <br />0 <br />N <br />3636213 Materials Testin Total 313.85 <br />36644019 Project Grand Total S 313.85 <br />