Engineering and <br />Construction Agreement <br />Public Works <br />Enqineerina <br />Job Number. ~G Contract Number. <br />Capital Project Number. <br />The undersigned owner requests the Public Improvements as described <br />Type of improvement: W A;~ I e UA C1 <br />Location: 3 - S-1k <br />(Street or easement ff a subdivision, print subdivision name) <br />North or east limit: South or west limit: <br />(except Or subdivisions) (except for subdivisions) <br />City of Eugene <br />858 Pearl <br />Eugene, OR 97401 <br />(541) 682-5291 <br />FAX:- (541) 682-5032 <br />be designed and constructed during the 2a_ lD or subsequent construction season in the following manner (check one): <br />(Year) <br />0 1. As a.City engineered and constructed project (eligible for assessment financing). <br />city agrees: <br />a) to perform engineering design, cost estimate, award of contract, construction inspection, and assessment <br />tabulation for the improvements; <br />b) to participate in the cost of necessary additional capacity of improvements beyond the assessable amounts <br />as stipulated in the Eugene Municipal Code. <br />Owner agrees: <br />a) to pay all engineering and construction costs which are not eligible for assessment financing. <br />b) If the undersigned owner chooses to discontinue the City engineering and construction process prior to <br />execution of a construction contract, the owner further agrees to pay all engineering and other project-related <br />costs incurred by the City to that point, and to comply with paragraph 2 below, if applicable. <br />2. Asa privately engineered and constructed project with private financing arranged by the Owner. <br />Owner agrees: <br />a) to install all required public improvements at no cost to the City; <br />b) to pay actual City costs incurred for plan review and processing, inspection, materials testing, and other <br />engineering services, all of which will be billed and payable monthly with final payment due prior to City's <br />final acceptance of the completed improvements. <br />c) to provide the City a bond, which includes a ore-year warranty period, in an amount sufficient to cover all engineering and <br />construction costs associated with completion of the required public improvements. <br />d) to pay other charges and levies for public improvements, If required. Other charges may include, but are not limited to: <br />1) penalty charges: in the event the property owner fails to make payment when due under this agreement, the property <br />owner shall be charged a penalty in the amount of $25 or tan percent (10%) of the past due amount, whichever is <br />greater. Payment of the penalty shall not consitute a waiver by the City of its other remedies. <br />2) interest charges: property owner shall pay interest on all past due amounts at the rate of eighteen percent (18°x) <br />per annum from the due date until paid. This sum shall be in addition to penalty charges. <br />PROPERTY OWNER <br />CO-OWNER <br />(Afird) <br />:'~2 W. 1.2 <br />ADDR S <br />~Q 9T~dr <br />4!Neh-- <br />cay/STA /ZIP <br />,6V / - 36~ 3 /6 <br />PHONE NUMBER fbuskmw hoard <br />CRY OF EUGENE <br />SIGNATURE I <br />TITLE <br />DATE <br />777 PEARL STREET <br />EUGENE, OREGON 97401 <br />ENS (429) ORIGINAL/CITY YELLOW/OWNER PINVINSPECTOR FEBRLIARY2002 <br />Xdle IPA11 '94Ml~ <br />PRO OWNER'S NA~ <br />SIGTJAI URE <br />