E U G E N E <br />Parks and <br />Opee Space <br />a division of Public Works <br />1820 Roosevelt Blvd. <br />Eugene, Oregon 97402 <br />Memorandum. <br />Date: May 14, 2010 <br />To: Johnny Medlin, Division Manager <br />cc: Lester L. Broc/k~'~C_o(ns~tpru~cft~i~o/jn <br />From: Brian Elliott +/~~ `11 ~ 1" J <br />Subject: City of Eugene Contract No. 2010-05330 <br />(Public Improvement'Contract) <br />(541)682-4800 <br />(541)682-4882 Fax <br />wtivw.ci.euge ne.or.us/parks <br />Attached for your review and execution is the Public Improvement Contract between the City of Eugene and <br />Lester L. Brock Construction to install the newly manufactured pazk entry signs. Six signs aze currently <br />fabricated and ready for installation, with 12 additional. signs slated to be manufactured and installed. <br />Additional signs may be fabricated and installed as funding allows. This contract is for the construction of the <br />concrete bases and the installing of the signs to them. Presently, two signs will be installed in Amazon Park, <br />two signs in Bethel Community Park, one sign in Maurie Jacobs Park, and one sign in Skinner Butte Pazk. <br />Work shall begin sometime between May 19 and May 28. Contractor will receive formal Notice to Proceed <br />from the City at that time. The total installation cost for 18 signs is $11, 210.00. <br /> <br />