Sent By: DAILY JOURNAL OF COMMERCE; 5032225358; 19-Oct-09 2:57AM; Page 7/7 <br />Exhibit A <br />CITY OF EUQi*NE <br />20¢9 PAVEMENT PRESERVATION <br />PROGRAM <br />Bids due 2:00 pm, April 2 <br />CALL FOR BIDS <br />Notice le hereby given that the City <br />Council of the City of Eugene, Oregon will <br />receive sealed bids until Thursday, April 2, <br />2009, until the Bid Closing time at 2:00 <br />p.m. at the office of the City Engineer, 99 <br />East Broadway Suite 400. Eugene, <br />Oregon. The Bid Opening will be at 2:05 <br />p.m., on Thursday. April 2, 2009, at the <br />above location, at which time and place <br />those Bids will be opened and read, <br />Job 4425 2009 PAVEMENT PRESER- <br />VATION PROGRAM <br />on County Club Road from Willagillespie <br />Road to Southwood Lane (13 8A Minor <br />Adjustment of Manholes; 98,700 SF Cold <br />Plane PVMT Removal, 3' Deep; 4,420 SY <br />Prime Coat, TRMSS; 1,901) TN Level 3, <br />112' Dense HMAC: 77 FT Standard Con- <br />crete Curbe; 438 $F Concrete islands; 550 <br />SF Cnnrrete Walks; 120 SF Truncated <br />Dome Texturing; 1 LS Thermoplastic, <br />Non-Profile, 90 MIL, Extruded; 11 EA <br />Square Tube Sign Supports-, 11 EA Loop <br />Detectors installation). <br />Twenty-eight (28) Work days will be al- <br />lowed and all work shall be completed by <br />July 31, 2009- <br />4434 on Fox Hollow Road from East Am- <br />azon Drive to Donald Street (53 EA Minor <br />Adjustment of Manholes: 26 EA Manhole <br />Remave/Replace Frames/Cover-WW; 22 <br />EA Manhole Remove/Replace Frame/ <br />Cover-STM; 8 FT 8' PVC WW Pipe; 230 <br />CY Asphalt Concrete Pavement Repair: <br />(3,000 SF Cold Plane PVMT Removal, <br />l'-3' Peep; 145,600 SF Cold Plane PVMT <br />Removal, 2'-3' Deep; 6,000 SF Cold Plane <br />PVMT Removal, 5' Deep; 3,350 TN Level <br />2, 1/2' Dense HMAC; 50 FT Concrete <br />Curb and Gutter, 155 FT Concrete Wide <br />Curb and Cutter; 1 LS Thermoplastic, <br />Non-Profile, 90 MIL, Extruded). <br />Twenty-eight (20) Work days will be at- <br />lowed and all work shall be completed by <br />July 01, 2009. <br />4502 an Crescent Avenue from Shadow <br />View Drive to Coburg Road (17 EA Minor <br />Adjustment of Manholes; 1 EA Concrete <br />Storm Drain Saddle Manhole; 90,930 SF <br />Cold Plane PVMT Removal, 2' Deep; <br />1,700 TN Level 3, 1/2' Dense HMAC; 250 <br />SF Concrete Walks, 7' Thick; 00 SF Trun- <br />cated Dome Texturing; 1 LS <br />Thermoplastic, Non-Profile 90 MIL, Extrud- <br />ed: 9 EA Loop Detectors Installation; 70 <br />FT Conduit Under Hard Surfacing; 9 EA <br />Removal of Pedestrian Buttons: 8 EA Audi- <br />ble Pedestrian Push Buttons; 8 EA Pedes- <br />trian Push Button Posts), <br />Twenty-four (24) Work days will be at, <br />lowed and all work shall be completed by <br />July 31, 2009. <br />Tne above jots (#4425, 44$4 6 4502) <br />will be awarded as one contract. <br />Plans and specifications may be re- <br />viewed andfor obtained at the office of the <br />City Enginoor, 99 East Broadway, Eugene, <br />Oregon 97441, for s non-refundable fee of <br />$16.00 plus $6.50 postage. For othdr re- <br />viewing locations and any questions re- <br />garding the project please call (541) <br />682.5560, or use our Engineering Bid <br />Website www.ougene-or.gov/PW to review <br />Plane and Specifications. <br />Bida shall be accompanied by a certified <br />check, cashier's check or bldder's bond <br />payable to the City of Eugene in an <br />amount equal to ten percent of the amount <br />bid. Filing of a qualification questionnaire <br />before bidding will not he required. Contin- <br />gent of conditional bids will not be consid- <br />ered for acceptance. This public works im- <br />provement project is subject to payment of <br />prevailing rate of wages, per BOLT ORS <br />279C.800 to 279C,870. No bid will be re- <br />ceived or conaidered unless the bid con- <br />tains a statement by the bidder that provi- <br />sions of ORS 279C,800 to 2790.970 per- <br />taining to prevailing wage rates shall be <br />complied with. <br />Bidders are required to submit a <br />First-Tier Subcontractor Disclosure form, <br />substantially as descrow in ORS <br />2790,370, prior to the Bid Closing Date <br />and Time. Far this project the first-tler Sub- <br />contractor disclosure statement must be <br />submitted regardless of the bid arnount,' <br />No bid will be accepted by the City <br />unless It contains a statement by the bid- <br />der as a part of the bid that the bldder in <br />carrying out the contract will comply with <br />all applicable laws. <br />The City may reject any bid not in com- <br />pliance with all proscribed public bidding <br />procedures and requirements, and may to- <br />fact for good cause any or all bids or to <br />waive any Specification or requirement <br />up-an a finding of the City that It Is In the <br />public interest to do so. <br />Dated this 18th day of Match, 2009, <br />MATT RODRIGUES <br />Project Manager <br />Published Mar. 18, 2009, 10142646CB-1t <br />