Sent By: DAILY JOURNAL OF COMMERCE; 5032225358; 19-Oct-09 2:57AM; Page 5/7 <br />Exhibit A. <br />CITY OF EUGENE <br />PAVING, CURBS, GUTTERS, <br />SIDEWALKS, STORM WATER <br />DRAINAGE AND WATER QUALITY <br />BIGSWALES <br />Bids due 2:00 pm, March 19 <br />CALL FOR BIDS <br />Notice is hereby given that the City <br />Council of the City of Eugene, Oregon will <br />receive sealed bids until Thursday, March <br />19, 2009, until the Bid Closing time of 2A0 <br />p,m, at the office of the City Engineer, 99 <br />East Broadway Suite 400, Eugene, <br />Oregon, The Bid Opening will be at 2:05 <br />p.m., on Thursday, March 19, 2009, at the <br />above location, at which lima and place <br />those Bids will be opened and read. <br />Job 4275 PAVING, CURBS, GUTTERS, <br />SIDEWALKS, STORM WATER DRAIN- <br />AGE AND WATER QUALITY 0I0- <br />SWALES <br />on Elmira Road from Bertelsen Road to <br />Maple Street and Maple Street from Elrnira <br />Road to Roosevelt Boulevard (30 FA Tree <br />Removal; 18,894 CY General Excavation; <br />19,823 SY Aggregate Base; 7,900 TN <br />HMAG; 5,830 FT Pipe (RCP, 0900, SDP, <br />6' to 30`); 31 EA 4A Concrete Inlets; 24 <br />EA Concrete Manholes; 1 EA Pollution <br />Control Manhole; 56,700 SF 4' Concrete <br />Walk; 22,844 SF W Concrete Driveway; <br />424 SF Truncated Domes: 12,321 FT Curb <br />and Gutter, 221 SF Permanent Signs; <br />9,000 FT Seeding, Mulch, and Bark; 16 EA <br />CBU Mailboxes), <br />All work shall be completed by October <br />1, 2009, <br />Plans and specifications may be re- <br />viewed and/or obtained at the office of the <br />City Engineer, 99 East Broadway, Eugene, <br />Oregon 97401, for a non-refundable fee of <br />$15,00 plus $6.50 postage. For other re- <br />viewing locations and any questions re- <br />garding the project please call (541) <br />682-5560, or use our Engineering Bid <br />Website www.evgene-or.gov/PW to review <br />Plans and Specifications. <br />Bids shall be accompanied by a certified <br />check, cashier's check or blddei's bond <br />payable to the City of Eugenia in an <br />amount equal to ten pnr(6111. of the amount <br />Did. Filing of a qualification questionnaire <br />before bidding will not be required. Contin- <br />gant or conditional bids will not be rwnsid- <br />ered for acceptance. This public works im- <br />provamant project is subject to payment of <br />prevailing rate of wages, per SOLI ORS <br />2790,800 to 2790.870. No bid will be re- <br />ceived or considered unless the bid con- <br />talns a statement by the bidder that provl- <br />sionS of OR5 2790.800 to 279C.870 per- <br />taining to prevailing wage rates shall be <br />Complied with. <br />Bidders are required to submit a <br />First-Tler Subcontractor Disclosure form, <br />Substantially as described In ORS <br />2790.370, prior to the Bid Closing Date <br />and Time. For this project the first-tier sub- <br />contractor disclosure statement must be <br />submitted regardless of the bid amount. <br />No bid will be accepted by the City <br />urr1e88 It contains a statement by the bid- <br />der as a part of the bid that the bidder in <br />carrying out the contract will comply with <br />all applicable laws, <br />The City may reject any bid not In com- <br />pliance with all prescribed public bidding <br />procedures and requirements, and may re- <br />Jett for good oauaC any or all bids or to <br />waive any spedlicatlon or reQUirement <br />upon a finding of the City that It is in the <br />public interest to do so. <br />Dated this 3rd day, of March, 2009, <br />JOHN BONHAM <br />Project Managor <br />Publlshed Mar, 3, 2009. 10141822CB-1t <br />0000+0000• <br />