Sent By: DAILY JOURNAL OF COMMERCE; 5032225358; 19-Oct-09 2:57AM; Page 5/7
<br />Exhibit A.
<br />CITY OF EUGENE
<br />PAVING, CURBS, GUTTERS,
<br />SIDEWALKS, STORM WATER
<br />DRAINAGE AND WATER QUALITY
<br />BIGSWALES
<br />Bids due 2:00 pm, March 19
<br />CALL FOR BIDS
<br />Notice is hereby given that the City
<br />Council of the City of Eugene, Oregon will
<br />receive sealed bids until Thursday, March
<br />19, 2009, until the Bid Closing time of 2A0
<br />p,m, at the office of the City Engineer, 99
<br />East Broadway Suite 400, Eugene,
<br />Oregon, The Bid Opening will be at 2:05
<br />p.m., on Thursday, March 19, 2009, at the
<br />above location, at which lima and place
<br />those Bids will be opened and read.
<br />Job 4275 PAVING, CURBS, GUTTERS,
<br />SIDEWALKS, STORM WATER DRAIN-
<br />AGE AND WATER QUALITY 0I0-
<br />SWALES
<br />on Elmira Road from Bertelsen Road to
<br />Maple Street and Maple Street from Elrnira
<br />Road to Roosevelt Boulevard (30 FA Tree
<br />Removal; 18,894 CY General Excavation;
<br />19,823 SY Aggregate Base; 7,900 TN
<br />HMAG; 5,830 FT Pipe (RCP, 0900, SDP,
<br />6' to 30`); 31 EA 4A Concrete Inlets; 24
<br />EA Concrete Manholes; 1 EA Pollution
<br />Control Manhole; 56,700 SF 4' Concrete
<br />Walk; 22,844 SF W Concrete Driveway;
<br />424 SF Truncated Domes: 12,321 FT Curb
<br />and Gutter, 221 SF Permanent Signs;
<br />9,000 FT Seeding, Mulch, and Bark; 16 EA
<br />CBU Mailboxes),
<br />All work shall be completed by October
<br />1, 2009,
<br />Plans and specifications may be re-
<br />viewed and/or obtained at the office of the
<br />City Engineer, 99 East Broadway, Eugene,
<br />Oregon 97401, for a non-refundable fee of
<br />$15,00 plus $6.50 postage. For other re-
<br />viewing locations and any questions re-
<br />garding the project please call (541)
<br />682-5560, or use our Engineering Bid
<br />Website www.evgene-or.gov/PW to review
<br />Plans and Specifications.
<br />Bids shall be accompanied by a certified
<br />check, cashier's check or blddei's bond
<br />payable to the City of Eugenia in an
<br />amount equal to ten pnr(6111. of the amount
<br />Did. Filing of a qualification questionnaire
<br />before bidding will not be required. Contin-
<br />gant or conditional bids will not be rwnsid-
<br />ered for acceptance. This public works im-
<br />provamant project is subject to payment of
<br />prevailing rate of wages, per SOLI ORS
<br />2790,800 to 2790.870. No bid will be re-
<br />ceived or considered unless the bid con-
<br />talns a statement by the bidder that provl-
<br />sionS of OR5 2790.800 to 279C.870 per-
<br />taining to prevailing wage rates shall be
<br />Complied with.
<br />Bidders are required to submit a
<br />First-Tler Subcontractor Disclosure form,
<br />Substantially as described In ORS
<br />2790.370, prior to the Bid Closing Date
<br />and Time. For this project the first-tier sub-
<br />contractor disclosure statement must be
<br />submitted regardless of the bid amount.
<br />No bid will be accepted by the City
<br />urr1e88 It contains a statement by the bid-
<br />der as a part of the bid that the bidder in
<br />carrying out the contract will comply with
<br />all applicable laws,
<br />The City may reject any bid not In com-
<br />pliance with all prescribed public bidding
<br />procedures and requirements, and may re-
<br />Jett for good oauaC any or all bids or to
<br />waive any spedlicatlon or reQUirement
<br />upon a finding of the City that It is in the
<br />public interest to do so.
<br />Dated this 3rd day, of March, 2009,
<br />JOHN BONHAM
<br />Project Managor
<br />Publlshed Mar, 3, 2009. 10141822CB-1t
<br />0000+0000•