New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4617 4583 4644 Eugene Sand Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4617 4583 4644 Eugene Sand Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 3:45:31 PM
Creation date
5/18/2010 11:00:12 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004583
GL_Project_Number
995354
COE_Contract_Number
2010-00020
Retention_Destruction_Date
10/17/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
04/16/2010 15:46 FAX 541 682 8410 CITY EUGENE PW ENG 4 EUGENE SAND IA002/008 <br />Public Works <br />Engineering <br />City of Eugene <br />99 East Broadway, Suite 400 <br />Eugene, Oregon 97401 <br />(541) 682-5560 <br />(541) 682-8410 FAX <br />ADDENDUM NO.1 <br />TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />2010 PAVEMENT PRESERVATION PROGRAM <br />HAWEINNS LANE FROM W 18TH AVENUE TO 100' SOUTH OF VIDERA DRIVE (JOB #4583) <br />33RD AVENUE FROM EMYARD STREET TO WILLAMETTE STREET (JOB #4617) <br />OAKWAY ROAD FROM CAL YOUNG ROAD TO FAIRWAY LOOP (JOB #4655) <br />APRIL 16, 2010 <br />JOB #4583, 4617, & 4655 <br />BID NUMBER 7 <br />TO ALL PLANHOLDERS: <br />The following changes shall amend and supplement the project bidding documents only to the extent specifically <br />shown and noted. All other conditions shall remain the same. <br />Bidders shall incorporate the effects of these changes in the appropriate bid items included in this addendum and the <br />total of these bid items then add in the appropriate place on the bid form. <br />CHANGES FOR BID SCHEDULE: <br />(DELETE) Original Bid Schedule dated 04105/2010 <br />(ADD) Revised Bid Schedule dated 04/16/2010 <br />CHANGES TO PLAN SHEETS: <br />(REVISE) Sheets 4583-DO1 and 4583-1302, change all references to "Level 3,1/2" Dense WMAC" to "Level 2,1/2" <br />Dense WMAC". <br />CHANGES TO SPECIAL PROVISIONS: <br />(ADD) 00290.21 Construction Waste Reuse and Recycling Plan and Summary <br />The Contractor shall fill out and submit the "Contractor's Construction Waste Reuse and Recycling <br />Plan", estimating material reuse, recycling, and disposal for each project at the pre-construction <br />conference. After issuance of second notification the Contractor shall fill out the "Contractor's <br />Construction Waste Reuse and Recycling Summary" with actual data on material reuse, recycling, and <br />disposal for each project. The Agency will not issue the Project third notification until submission of the <br />"Contractor's Construction Waste Reuse and Recycling Summary". <br />00290.80 Measurement <br />(ADD) Payment will be made by the each for required submittals of the "Contractor's Constriction Waste Reuse <br />and Recycling Plan" and "Contractor's Construction Waste Reuse and Recycling Summary" <br />Addendum #I - Job #4583, 4617, & 4655 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.