BID NO.7 <br />CALL FOR BIDS <br />Notice is hereby given that the City Council of the City of Eugene, Oregon will receive sealed bids until Thursday, <br />April 22, 2010, until the Sid Closing time of 2:00 p.m. at the office of the City Engineer, 99 East Broadway Suite <br />400, Eugene, Oregon. The Bid Opening will be at 2:05 p.m., on Thursday, April 22, 2010, at the above location, at <br />which time and place those Bids will be opened and read. <br />Job 2010 PAVEMENT PRESERVATION PROGRAM <br />4583 on Hawkins Lane from W.18"' Avenue to 100'south of Videra Drive (750 HR Flaggers; 42 EA Minor <br />Adjustment of Manholes; 173,800 SF Cold Plane PVMT Removal, 3" Deep; 3,870 TON Level 2,1/:" <br />Dense WMAC; 510 CY Asphalt'Concrete Pavement Repairs; I LS Thermoplastic, Non-Profile, 90 Mil, <br />Extruded; 6 EA Loop Detectors Installation). <br />Work shall not begin prior to May 10, 2010 <br />All Work shall be completed by June 30, 2010 <br />Twenty-five (25) Work days will be allowed <br />4617 on 33r`' Avenue from Hilyard Street to Willamette Street (300 HR Flaggers;13 EA MinorAdjustment <br />of Manholes; 33,500 SF Cold Plane PVMT Removal, 2" Deep; 47,000 SF Cold Plane PVMT Removal, <br />3.5" Deep; 9,000 SF Cold Plane PVMT Removal, 3.5"-4.5" Deep; 1,900 TON Level 2, 1/2' Dense <br />WMAC; 265 CY Asphalt Concrete Pavement Repair; 390 SF Concrete Walk, 4" Thick; 1 LS <br />Thermoplastic, Non-Profile, 90 Mil, Extruded; 3 EA Loop Detectors Installation). <br />Work shall not begin prior to June 21, 2010 <br />All Work shall be completed by August 13, 2010 <br />Twenty-two (22) Work days will be allowed <br />4655 on Oakway Road from Cal Young Road to Fairway Loop (500 HR Flaggers;103 FT 10" C900 Pipe; <br />24 EA Adjusting Boxes; 15 EA Minor Adjustment of Manholes; 98,700 SF Cold Plane PVMT <br />Removal, 3" Deep; 9,620 SY Seal Coat; 1,840 TON Level 3, 1/" Dense WMAC; 40 CY Asphalt <br />Concrete Pavement Repair; 1 LS Thermoplastic, Non-Profile, 90 Mil, Extruded; 8 Each Loop <br />Detectors Installation; 80 FT Conduit Under Hard Surfacing). <br />Work shall not begin prior to May 10, 2010 <br />All Work shall be completed by June 30, 2010 <br />Twenty-eight (28) Work days will be allowed <br />The above jobs (#4583, 4617 and 4655) will be awarded as one contract. <br />Plans and specifications may be reviewed and/or obtained at the office of the City Engineer, 99 East Broadway Suite <br />400, Eugene, Oregon 97401, fora non-refundable fee of $15.00 plus $6.50 postage. For other reviewing locations <br />and any questions regarding the project please call (541) 682-5291, or use our Engineering Bid Website www.eugene- <br />or.gov/PW to review Plans and Specifications. <br />Bids shall be accompanied by a certified check, cashier's check or bidder's bond payable to the City of Eugene in an <br />amount equal to ten percent of the amount bid. Filing of a qualification questionnaire before bidding will not be <br />required. Contingent or conditional bids will not be considered for acceptance. This public works improvement <br />project is subject to payment of prevailing rate of wages, per BOLI ORS 279C.800 to 279C.870. No bid will be <br />received or considered unless the bid contains a statement by the bidder that provisions of ORS 279C.800 to <br />279C.870 pertaining to prevailing wage rates shall be complied with. <br />